Subhead 15.0: Dismantling and Demolishing

access_time 1722593580000 face BHADANIS
Subhead 15.0: Dismantling and Demolishing Subhead 15.0: Dismantling and Demolishing This section covers the specifications for dismantling and demolishing structures, ensuring safety, precision, and proper disposal of materials. Below is a detailed breakdown of the content typically covered under th...

Subhead 14.0: Repairs to Buildings

access_time 1722507120000 face Gaurav Bhadani
Subhead 14.0: Repairs to Buildings Subhead 14.0: Repairs to Buildings This section outlines the specifications for various repair works in buildings, including detailed descriptions of the materials, methods, and quality standards required for different types of repair tasks. Here is a detailed brea...

Subhead 13.0: Finishing

access_time 1723198200000 face BHADANIS
Subhead 13.0: Finishing Subhead 13.0: Finishing This section covers the specifications for various types of finishing works in construction. It includes detailed descriptions of the materials, methods, and quality standards required for different types of plastering, painting, and other finishing ta...

Introduction to CPWD Specification Part 2

access_time 1715162940000 face BHADANIS
Introduction to CPWD Specification Part 2 Here are the explanations for the subheads from 13.0 to 26.0 in the CPWD Specifications: Subhead 13.0: Finishing This section covers various finishing works, including cement plastering, painting, distempering, and varnishing. It includes detailed procedures...
Pop-Up Message
Call Us CALL US !