Pop-Up Message
Call Us Call For Guidance

UNLOCK ! YOUR FULL POTENTIAL WITH BHADANIS LEVEL 1 TO 5 TRAINING 

BHADANIS LEVEL 1 TO 5 SYLLABUS FOR CIVIL ENGINEERS & CONSTRUCTION PROFESSIONALS 

Quantity Surveying & Estimation and Costing

Level 1 - Duration :- 45 Days
  1. Understanding the Role of BHADANI'S Construction Management Training and Role of Construction Managers in the Construction Industry
  2. Artificial Intelligence Introduction (**New**)
  3. Quality Control and Quality Assurance Techniques used (Basics)
  4. Construction Methodologies of Civil Works and How it works in Construction Industry
  5. Construction Activities Identification Analysis and Report Generation
  6. Making Project Chartered and Feasible Reports
  7. Project Risk Analysis and Action Reports
  8. Understanding and Reading the Structural and Architectural Drawings
  9. Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc.
  10. Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.)
  11. Faster Take off Methodologies from Drawings of Civil
  12. Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats
  13. Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards
  14. Estimation of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
  15. Estimation Technique During Design Phase
  16. Estimation Technique During Pre-Construction Phase
  17. Estimation Technique During Post-Construction Phase
  18. Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc.
  19. Pre-Engineered Building (PEB) Estimation
  20. Costing Techniques of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
  21. Costing Techniques- Risk Based Costing
  22. Costing Techniques - Parametric Costing
  23. Costing Techniques - Machinery Transport Management and Costing
  24. ​Costing Techniques - Scope Estimation and Cost Analysis
  25. Costing Techniques - Artificial Intelligence (**New**)
  26. Costing Techniques - Consulting Part and Software Usage Part for the Construction Project
  27. ​S-Curve Reporting
  28. Labour Deployment Planning As per Budget
  29. Labour Economics and Productivity Analysis
  30. Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique
  31. Economic Order Quantity (EOQ) and Management​
  32. Machinery Output Analysis as per Market Standards
  33. Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site
  34. Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards
  35. Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc.
  36. ​Bill of Quantity (BOQ) Take off (Material and Preparation)
  37. Rate Analysis of All Kinds of Civil Works
  38. Material Reconciliation Techniques from Contractor and Client's Side
  39. Material Procurement Strategies as per the techniques used in Quantity Surveying
  40. FREE LANCE Quantity Surveying with Hands on Practice
​After Completing Level 1 ~ You can Apply for the Position of Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges

Billing Engineering

Level 2 Duration :- 15 Days
  1. Understanding the Role of BHADANI'S Billing Engineer / Invoice Engineering in the Construction Management and Industry of India and World
  2. Billing Engineering Tasks at Site Office and Understanding the Role in Head office with the Client Coordiation
  3. Account Basics requirement for Billing Engineer
  4. Construction Billing Procedures From Client Side as well as Contractor Side
  5. Interim Payment Certification (IPC) from Client Sides as well as Contractor Side
  6. RA Bill Making - Client Billing - Subcontracting
  7. Billing with GST and Without GST - hands of Expertise
  8. CPWD and Corporations and PSU's Techniques of Billing
  9. Invoice Generation Through ERP
  10. Claim and Dispute Settlement Procedures and all required techniques in Billing and MIS Generation for the same
  11. Material Engineering Bills for Both Client Side as well as Contractor's Side
  12. ​Third Party Contractor Billing
  13. Joint Venture Companies / Contractor Billing
  14. Petty/ Vendor Billing
  15. Preliminary Billing - Post Construction Billing
  16. InterAlia Billing , International Billing Challan Generation
  17. Claim Management Procedures used by Invoice Engineers
  18. Claim of Price Variations as per Norms of Govt. of INDIA
  19. Claim of Quantity Variations as per the Norms of Govt. of INDIA
  20. Mode of Measurement as per IS Codes with Nomenclatures
  21. Claim of Extra Item Analysis of All Kinds of Civil Works During the Site Execution as well as Post Contracting Period
  22. Vendor Vs. Client Bill Reconciliation
​After Completing Level 1 and 2 ~ You can Apply for the Position of Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges

Tendering and Construction Contracts Management (Contract Engineering)

LEVEL 3 & 4:-​​​ DURATION :- 45 DAYS
  1. Tendering Documents Preparation
  2. Tendering Documents Submission Guidelines
  3. Tender Review Reports Generation (T.R.R) for the Contractors as well as Consultants
  4. Technical Bidding As per Government Laws and as per BHADANI'S Technique
  5. Financial Bidding As per Government Laws and as per BHADANI'S Technique
  6. ​Statutory Documents Preparation Techniques for the Tender
  7. Purchasing and Negotiation Techniques used by Clients and as well as Contractor's Side
  8. Pre-Bid Meeting Strategy Building and Coordination with Client
  9. Finding Deviations and Clarify with the Client
  10. Tender Hunting
  11. Reverse Auctioning Strategy Building and Pressurizing client for the tender
  12. Pooling Technique to use effectively for the Tender to get Maximize Benefits
  13. Evaluation Strategy - Bidding Strategy - Relationship Building
  14. Indemnify the Tender with the Use of Effective Monitoring of the Tender
  15. Entering Into Contracts - Strategy Building Approach - Scientific Approach
  16. Construction Contracts Documents Formulation and Preparation
  17. Procedures in Contract Management - Pre - Construction and Post Construction Phase
  18. Clearing , Forwarding and Transport
  19. Transport Management
  20. Interpretation of Contracts and Contract Terms
  21. Cost Overrun and Time Overrun - Strategy Building Approach
  22. Indian Laws for Construction Contract Management
  23. FIDIC International Laws (EPC Turnkey Projects)
  24. Work Order Preparation ( Like Alstom Siemens Etc.)
  25. ​Live Project Training for Procurement and Negotiation Techniques
​After Completing Level 1 to 4 ~ You can Apply for the Position of Tendering Engineer, Contracts Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges

PROJECTS MANAGEMENT AND PLANNING ENGINEERINGLevel 5 Duration :- 25 Days

Level 5 Duration :- 25 Days
  1. Critical Thinking and Problem Solving Approach
  2. Strategical Thinking and Risk Analysis
  3. Project Planning - Master Plan Generation
  4. Project Management Procedures Used for Construction Industry by Big MNC's and Construction Companies of India and World
  5. Role of Project Manager in Construction Industry
  6. Project Budget Preparation with all factors analysis in Hand
  7. Actual Situation Comparison with Budget Amount
  8. Progress Monitoring with the Key Indicators Strategy
  9. MS Project - Scheduling and Primavera P6 Software
  10. Project Coordination Techniques with Accounts , HR , Purchase and Procurement Departments with easy solutions
  11. Management Information Generation
  12. Modern Building Construction Trends Execution Plan & Strategy Building
  13. Resettlement and Rehabilitation (R&R) for speedy progress of work
  14. Quality Assurance with Total Quality Control Planning
  15. Site (Field) Management Techniques used by Project Managers at Site
  16. Management of Emergencies in High Rise Buildings
  17. Self Inspection for Quality Construction at Site
  18. Cost and Time Controlling Strategies used for Construction Projects
  19. Cash Flow Monitoring - Budget Vs Actual Comparison
  20. Green Sheet Report - Profit and Loss Determination for Construction Projects
  21. SWOT Analysis for Construction Project
  22. JIT Implementation in any Construction Project
  23. ​Earned Value Management (EVM) in Construction Project
​After Completing Level 1 to Level 5 ~ You can Apply for the Position of Planning Engineer, Project Manager, General Manager, In charge, Tendering Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges

Blinking Button

CONTACT BHADANIS AND START YOUR RIGHT JOURNEY TODAY !!