There are no items in your cart
Add More
Add More
Item Details | Price |
---|
QTO METHODS PROCEDURES FOR MAJOR & MINOR BRIDGE CONSTRUCTION PROJECTS ONLINE COOURSE
Language: ENGLISH
Instructors: BHADANIS QUANTITY SURVEYING & CONSTRUCTION MANAGEMENT INTERNATIONAL TRAINING INSTITUTE 2016
Validity Period: 265 days
4 BHADANIS Institute Coins as Cashback
Why this course?
QTO METHODS PROCEDURES FOR MAJOR & MINOR BRIDGE CONSTRUCTION PROJECTS ONLINE COOURSE
Quantity Take-Off (QTO) Methods & Procedures for Major & Minor Bridge Construction Projects
Course Overview
This comprehensive training program covers systematic methods and procedures for carrying out accurate quantity take-off (QTO) in bridge construction—whether for a simple minor culvert or a grand multi-span viaduct. Over ten detailed modules, you’ll progress from the fundamentals of bridge types and measurement codes, through site data collection, substructure and superstructure QTO, reinforcement detailing, formwork, ancillaries, concrete and grouting works, all the way to cost integration, quality control and final handover documentation.
Delivered in a conversational, plain-English style, this course equips civil engineers, quantity surveyors, estimators, project managers and other construction professionals with the practical know-how to generate reliable Bill of Quantities (BOQ) for bridge projects in India, the Gulf region and the USA. You’ll learn to set up manual QTO templates, apply measurement rules from IS and AASHTO codes, tabulate take-off items in clear spreadsheets, integrate unit rates, and maintain a transparent audit trail of assumptions, RFIs and revisions.
Why This Course Matters
Bridges represent some of the most complex and costly civil engineering works. Inaccurate quantities can lead to:
Cost overruns when steel, concrete or formwork orders fall short or go unused
Claims and disputes over who bears the extra cost of unanticipated excavation or reinforcement
Delays as site teams wait for missing materials or equipment
Erosion of client confidence in the estimating team
By mastering proven QTO procedures, you’ll:
Control budgets with precision
Reduce risk of variation claims
Improve tender competitiveness through clear, defensible BOQs
Streamline handover with fully documented, auditable estimates
Target Audience
Quantity Surveyors and Estimators preparing BOQs for bridge projects
Civil Engineers overseeing design-to-construction workflows
Construction Managers coordinating site procurement and progress
Project Planners and Cost Controllers seeking robust cost data
Engineering Graduates aspiring to specialize in infrastructure estimation
Course Structure & Modules
Module No. | Title | Key Topics |
---|---|---|
1 | Introduction to Bridge QTO | Bridge types & components; QTO principles; measurement codes; manual template setup |
2 | Site Investigation & Data Collection | Drawing/spec review; site reconnaissance; topographical & geotechnical data; data-capture checklists |
3 | Substructure Quantity Take-Off | Abutments, piers & columns; footings & shafts; wing walls & backfill; drainage & weep holes; QTO sheet design |
4 | Superstructure Quantity Take-Off | Girders, beams & cross-girders; deck slab, haunches & kerbs; approach slabs; consolidating quantities |
5 | Reinforcement Detailing & QTO | Bar bending schedules; reinforcement for girders & decks; lapping & anchorage; fabric mesh; checking totals |
6 | Formwork & Falsework Quantities | Designing formwork profiles; falsework supports; shuttering materials; tabular formwork QTO sheets |
7 | Bearings, Expansion Joints & Ancillaries | Elastomeric & pot bearings; expansion joint assemblies; handrails & parapets; drainage gratings |
8 | Concrete Works & Grouting | Mass concrete foundations; high-strength girders & overlays; bearing & baseplate grouting; provisional sums |
9 | Rate Analysis & Cost Integration | Applying unit rates; labour, plant & material breakdown; waste & contingency allowances; composite cost schedule |
10 | Quality Control, Verification & Documentation | Cross-checking QTO vs. site records; managing revisions & RFIs; final BOQ with notes; handover & audit trail |
Module Highlights & Learning Outcomes
Introduction to Bridge QTO
Identify major bridge forms (beam, arch, cable-stayed, suspension) and their measurement implications
Understand unit definitions per IS 1200 (India), SMM GCC (Gulf), AASHTO (USA)
Build a manual take-off template with columns for item code, description, unit, quantity, rate and remarks
Site Investigation & Data Collection
Translate plan, section and as-built records into measurable take-off items
Record topographical features and geotechnical constraints that affect QTO (e.g. variable foundation depths)
Develop a checklist to ensure no data gap before starting quantity measurement
Substructure QTO
Measure volumes for spread footings, pile caps, rafts and pier bulbs using plain-text formulas (e.g. “Vol = length × width × thickness”)
Quantify wing wall backfill and criteria for backfill compaction allowances
Tabulate substructure items in a QTO sheet for direct import into BOQ
Superstructure QTO
Extract girder, cross-girder and beam profiles for volume and surface-area calculations
Calculate deck slab, haunch and kerb quantities; include allowances for drop panels or cantilevers
Consolidate superstructure line items into comprehensive tables
Reinforcement Detailing & QTO
Prepare bar bending schedules for piers, abutments, girders and slab meshes
Compute lap lengths: “Lap = factor × diameter” (e.g. “Lap = 40 × 0.016 m = 0.64 m”)
Tabulate lapping, anchorage, fabric mesh overlaps and compare to design report tonnages
Formwork & Falsework Quantities
Design formwork areas (faces, soffits, edge reveals) and add waste allowances (5–10 %)
Lay out falsework props, walings, transoms, ledgers and braces; calculate numbers via grid spacing formulas
Produce tabular QTO sheets for easy review and pricing
Bearings, Joints & Ancillaries
Distinguish elastomeric, laminated and pot bearings; measure pad counts, seat plates, bolts and grout volumes
Quantify expansion joint frames, seals, cover plates, fillers and anchors
Itemize handrails, parapets, crash barriers and drainage gratings with post spacings and panel counts
Concrete Works & Grouting
Compute mass concrete volumes in foundations & piers; apply over-break allowances (3–5 %)
Measure high-strength concrete volumes in precast girders and deck overlays; add batching waste (2 %)
Calculate non-shrink grout volumes under bearings and in post-tension ducts; include pump and labour
Rate Analysis & Cost Integration
Source and validate unit rates from supplier quotes, historical data or standard rate books
Break down rates into labour, plant and material components: “Labour cost = worker-hours per unit × wage/hr”
Integrate multiple currencies with FX conversion and produce a composite cost schedule
Quality Control & Handover
Cross-check QTO against site pour logs and delivery tickets; calculate variance % = (site – QTO) ÷ QTO ×100
Manage RFIs and revision logs, linking each change to QTO lines and drawing revisions
Prepare the final BOQ with detailed notes, assumptions, revision history, RFI register and complete audit trail
Importance for Civil Engineers & Construction Professionals
Accuracy & Accountability: A robust QTO process reduces site wastage, tightens budget forecasts and minimizes contractual claims.
Communication: Clear, tabulated quantities and rates ensure interdisciplinary teams—from design engineers to site supervisors—share the same data.
Compliance: Adhering to local measurement codes (IS, SMM, AASHTO) ensures uniformity and fairness in tendering and billing.
Decision Support: Detailed cost breakdowns aid managers in value engineering and risk mitigation.
Career Advancement: Mastery of bridge QTO methods distinguishes you as a specialist in infrastructure estimation—a highly sought skill in global markets.
Practical Features & Templates
Tabular QTO Sheets for each discipline—simply replace “Item No.”, “Description” and “Calculation” columns with your project data.
Inline Plain-Text Formulas throughout modules—no code blocks, math boxes or software jargon.
Checklists & Logs for site data capture, RFIs, revisions and handover, ensuring nothing slips through the cracks.
Regional Case Studies from India, Gulf countries and the USA show real-world application of allowances, rates and codes.
Course Delivery & Materials
Interactive Lectures: Conversational style, with live examples and Q&A.
Hands-On Workshops: Build QTO templates in spreadsheets; practice measuring sample bridge details.
Case Study Assignments: Apply methods to a hypothetical bridge project in your region.
Expert Feedback: Review your take-off with trainers experienced in major infrastructure projects.
After successful purchase, this item would be added to your courses.You can access your courses in the following ways :