arrow_back
Module 1: Introduction to Bridge QTO
1-QTO-Methods-Procedures-for-Major-and-Minor-Bridge-Construction-Projects
1.1 Types of Bridges & Key Components
1.2 Principles of Quantity Take-Off in Bridge Works
1.3 Relevant Standards and Measurement Codes
1.4 Setting Up Manual QTO Templates
Module 2: Site Investigation & Data Collection
2-QTO-Methods-and-Procedures-for-Major-and-Minor-Bridge-Construction-Projects
2.1 Reviewing Drawings, Specifications, and As-built Records
2.2 Site Reconnaissance and Topographical Data
2.3 Geotechnical Reports and Their QTO Implications
2.4 Creating a Data-Capture Checklist
Module 3: Substructure Quantity Take-Off
3-Bridge-Quantity-Take-Off-Methods-and-Procedures_
3.1 Abutments: Foundations, Wing Walls, Backfill
3.2 Piers and Columns: Footings, Shafts, Caps
3.3 Substructure Drainage and Weep Holes
3.4 Tabulating Substructure Items in a QTO Sheet
Module 4: Superstructure Quantity Take-Off
4-Bridge-Quantity-Take-Off-Methods-and-Procedures
4.1 Girders, Beams, and Cross-Girders
4.2 Bridge Deck Slab: Slab, Haunches, Kerbs
4.3 Approach Slabs and Transition Units
4.4 Consolidating Superstructure Quantities
Module 5: Reinforcement Detailing & QTO
5-QTO-Methods-and-Procedures-for-Major-and-Minor-Bridge-Construction-Projects
5.1 Bar Bending Schedules for Piers and Abutments
5.2 Reinforcement for Girders and Deck Slab
5.3 Lapping, Anchorage, and Fabric Mesh Quantities
5.4 Checking Totals Against Design Reports
Module 6: Formwork & Falsework Quantities
6-QTO-Methods-and-Procedures-for-Major-and-Minor-Bridge-Construction-Projects
6.1 Designing Formwork Areas and Profiles
6.2 Falsework Supports for Span Construction
6.3 Shuttering Materials: Timber, Plywood, Props
6.4 Tabular Formwork QTO Sheets
Module 7: Bearings, Expansion Joints & Ancillaries
7-QTO-Methods-and-Procedures-for-Major-and-Minor-Bridge-Construction-Projects
7.1 Elastomeric and Pot Bearings: Types and Qty
7.2 Expansion Joint Assemblies and Accessories
7.3 Handrails, Parapets, and Crash Barriers
7.4 Ancillary Drainage and Gratings
Module 8: Concrete Works & Grouting
8-Bridge-QTO-Methods-and-Procedures
8.1 Mass Concrete in Foundations and Piers
8.2 High-Strength Concrete in Girders and Deck
8.3 Grouting Under Bearings and Base Plates
8.4 Measuring Provisional Sums and Over-break
Module 9: Rate Analysis & Cost Integration
9-QTO-METHODS-PROCEDURES-FOR-MAJOR-and-MINOR-BRIDGE-CONSTRUCTION-PROJECTS
9.1 Applying Unit Rates to Take-Off Items
9.2 Labour, Plant and Material Breakdown
9.3 Allowances: Waste, Contingencies, Provisional Sums
9.4 Building a Composite Cost Schedule
Module 10: Quality Control, Verification & Documentation
10-QTO-Methods-and-Procedures-for-Major-and-Minor-Bridge-Construction-Projects
10.1 Cross-checking QTO with Site Measurement Records
10.2 Managing Revisions and RFIs for Quantities
10.3 Preparing the Final BOQ with Notes and Assumptions
10.4 Handover Documentation and Audit Trail
Preview - QTO METHODS PROCEDURES FOR MAJOR & MINOR BRIDGE CONSTRUCTION PROJECTS ONLINE COOURSE
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US !