arrow_back
Module 1: Introduction to Kerala PWD SOR and Quantity Surveying
1.1 Overview of Kerala PWD SOR – Structure and Components
1.2 Role of Quantity Surveyor in PWD Projects
1.3 Types of Estimation in Kerala PWD Projects
1.4 Basic Concepts in Measurement and Standard Units
Module 2: Understanding Bill of Quantities (BOQ) Preparation
2.1 Purpose and Importance of BOQ in Kerala PWD Projects
2.2 Structure and Format of BOQ as per Kerala PWD
2.3 Methodology for Preparing BOQ from Drawings and Specifications
2.4 Handling Special Items and Extra Works in BOQ
Module 3: Rate Analysis Techniques Based on Kerala PWD SOR
3.1 Components of Rate Analysis for Civil Works
3.2 Calculation of Material Quantities and Market Rate Survey
3.3 Labour Rate Computation as per Kerala PWD Norms
3.4 Overhead, Profit, and Contingency Allowances
Module 4: Estimation of Earthwork and Site Preparation
4.1 Types of Earthwork in Kerala PWD Projects
4.2 Measurement Methods for Earthwork
4.3 Rate Analysis for Earthwork Items
4.4 Estimating Site Preparation and Temporary Works
Module 5: Concrete Work Estimation and Costing
5.1 Types of Concrete Works Covered in Kerala PWD SOR
5.2 Quantity Calculation for Concrete Components
5.3 Rate Analysis of Concrete Works
5.4 Formwork and Shuttering Estimation
Module 6: Steel Reinforcement Estimation and Costing
6.1 Types of Steel Reinforcement Used in Kerala PWD Projects
6.2 Measurement Rules for Reinforcement Steel
6.3 Rate Analysis for Steel Reinforcement
6.4 Handling Structural Steel and Fabricated Items
Module 7: Masonry Work Estimation and Costing
7.1 Types of Masonry Covered in Kerala PWD SOR
7.2 Quantity Measurement of Masonry
7.3 Rate Analysis for Masonry Work
7.4 Plastering and Pointing Estimation
Module 8: Flooring and Finishing Work Estimation
8.1 Types of Flooring Included in Kerala PWD SOR
8.2 Quantity Estimation for Flooring
8.3 Rate Analysis for Flooring Items
8.4 Finishing Works: Painting, Polishing, and Waterproofing
Module 9: Plumbing and Sanitary Estimation and Costing
9.1 Types of Plumbing Works in Kerala PWD Projects
9.2 Quantity Estimation for Pipes and Fittings
9.3 Rate Analysis for Plumbing Works
9.4 Sanitary Fittings and Accessories Costing
Module 10: Electrical Works Estimation and Costing
10.1 Scope of Electrical Works in Kerala PWD Projects
10.2 Quantity Measurement for Electrical Items
10.3 Rate Analysis of Electrical Installation Works
10.4 Estimation of Lighting and Power Fixtures
Module 11: Road and Pavement Works Estimation
11.1 Types of Road Works in Kerala PWD SOR
11.2 Quantity Measurement for Road Components
11.3 Rate Analysis of Road Works
11.4 Estimation of Road Marking and Signage
Module 12: Bridge and Culvert Works Estimation
12.1 Components of Bridge and Culvert Works in Kerala PWD SOR
12.2 Quantity Measurement for Structural Components
12.3 Rate Analysis for Bridge Works
12.4 Estimation of Ancillary Works
Module 13: Preparation of Running Account Bills and Final Bills
13.1 Understanding Running Account Bill (RAB) Procedures
13.2 Measurement and Verification for Running Account Bills
13.3 Preparation of Final Bill and Closure
13.4 Common Issues and Solutions in Bill Preparation
Module 14: Contract Management and Tendering Process in Kerala PWD
14.1 Overview of Tendering Procedures under Kerala PWD
14.2 Preparation and Submission of Tender Estimates
14.3 Contract Types and Payment Terms
14.4 Handling Variations and Claims
Module 15: Practical Case Studies and Project Work Using Kerala PWD SOR
15.1 Estimation of a Residential Building Project
15.2 Estimation of Road Rehabilitation Project
15.3 Running Account Bill Preparation and Certification
15.4 Final Bill Preparation and Project Closure
Preview - Estimation and Costing based on Kerala PWD (Malayalam) Schedule of Rates (SOR)
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!