Module 1: Introduction to Maharashtra PWD Schedule of Rates (SOR)
Module 1 Marathi
1.1 Overview of Maharashtra PWD and Its Role in Infrastructure Development
1.2 Understanding Schedule of Rates (SOR) – Definition and Importance
1.3 Components of Maharashtra PWD SOR
1.4 How to Use Maharashtra PWD SOR for Estimation
Module 2: Basics of Estimation and Costing in PWD Projects
Module 2 Marathi
2.1 Types of Estimates in PWD Projects
2.2 Units of Measurement and Conversion Factors
2.3 Quantification Process for Civil Works
2.4 Role of Rate Analysis in Costing
Module 3: Detailed Understanding of Civil Work Items in Maharashtra PWD SOR
Module 3 Marathi
3.1 Earthwork and Excavation Items
3.2 Concrete and Cement Work Items
3.3 Masonry and Brickwork Items
3.4 Finishing Works (Plastering, Painting, 1. Flooring
Module 4: Rate Analysis and Component Costing
Module 4 Marathi
4.1 Material Cost Calculation According to Maharashtra Market Rates
4.2 Labour Cost Determination as per PWD Norms
4.3 Equipment and Machinery Costing in Estimation
4.4 Overheads and Contractor Profit in Rate Analysis
Module 5: Preparation of Bill of Quantities (BOQ) as per Maharashtra PWD SOR
Module 5 Marathi
5.1 Principles of BOQ Preparation for PWD Projects
5.2 Measurement and Quantity Calculation for BOQ Items
5.3 Integration of SOR Rates into BOQ
5.4 Checking and Finalizing BOQ for Tendering
Module 6: Estimation for Road Works under Maharashtra PWD
Module 6 Marathi
6.1 Understanding Road Work Items in Maharashtra SOR
6.2 Costing of Bituminous Works
6.3 Drainage and Protective Works in Road Construction
6.4 Road Finishing and Safety Works Estimation
Module 7: Estimation of Bridge and Culvert Works as per Maharashtra PWD SOR
Module 7 Marathi
7.1 Classification of Bridges and Culverts in Maharashtra PWD
7.2 Estimation of Foundation and Substructure Works
7.3 Superstructure Estimation: Girders, Deck Slabs, and Parapets
7.4 Ancillary Works Estimation: Expansion Joints, Bearings, and Drainage
Module 8: Structural Steel and Reinforcement Estimation
Module 8 Marathi
8.1 Steel Reinforcement Bar (Rebar) Measurement and Costing
8.2 Structural Steel Sections as per Maharashtra PWD SOR
8.3 Fabrication and Erection Charges for Steel Works
8.4 Protective Coatings and Finishing for Steel Structures
Module 9: Plumbing and Sanitary Works Costing as per PWD Standards
Module 9 Marathi
9.1 Estimation of Water Supply Systems
9.2 Sanitary Installation Costing
9.3 Rainwater Harvesting and Stormwater Drainage Works
9.4 Testing and Commissioning Charges
Module 10: Electrical Works Estimation in PWD Projects
Module 10 Marathi
10.1 Electrical Wiring and Conduit Estimation
10.2 Lighting Fixtures and Installation Charges
10.3 Power Distribution and Control Panels Costing
10.4 Earthing and Safety Systems Estimation
Module 11: Estimation of Landscaping and External Works
Module 11 Marathi
11.1 Earthworks and Soil Preparation for Landscaping
11.2 Planting and Nursery Supplies Costing
11.3 Hardscape Works: Paving, Footpaths, and Boundary Walls
11.4 Irrigation System Estimation
Module 12: Contingencies, Provisions, and Escalation in Estimation
Module 12 Marathi
12.1 Understanding Contingency in Project Costing
12.2 Provisions for Price Escalation and Inflation
12.3 Provisions for Taxes, Duties, and Statutory Levies
12.4 Risk Allowances and Unforeseen Expenses
Module 13: Tendering Process and Costing Strategy for Maharashtra PWD Projects
Module 13 Marathi
13.1 Understanding Tender Documents and Conditions
13.2 Costing for Competitive Bidding
13.3 Bid Analysis and Comparative Statement Preparation
13.4 Post-Tender Negotiation and Contract Finalization
Module 14: Measurement and Billing Procedures in Maharashtra PWD Projects
Module 14 Marathi
14.1 Measurement Book (MB) Preparation and Maintenance
14.2 Running Account and Final Bill Preparation
14.3 Handling Variations and Extra Items
14.4 Audit and Quality Checks in Billing
Module 15: Case Studies and Practical Applications in Maharashtra PWD Estimation
Module 15 Marathi
15.1 Case Study: Estimation of a Road Construction Project
15.2 Case Study: Estimation of a Small Bridge Project
15.3 Practical Exercise: Preparing Rate Analysis for Concrete Work
15.4 Practical Exercise: Preparing Running Account Bill for a PWD Project
Preview - Estimation and Costing Course based on Maharashtra PWD Schedule of Rates (SOR) महाराष्ट्र PWD शेड्यूल ऑफ रेट्स (SOR) आधारित मोजणी आणि खर्च गणनेचा कोर्स