Pop-Up Message
Call Us CALL US !

NRM1: Take-Off and Preparing Cost Plan BOQ Procedure – Practical Guide for Civil Engineers & Quantity Surveyors

NRM1: Take-Off and Preparing Cost Plan BOQ Procedure – Practical Guide for Civil Engineers & Quantity Surveyors

Language: ENGLISH

Instructors: BHADANIS QUANTITY SURVEYING & CONSTRUCTION MANAGEMENT INTERNATIONAL TRAINING INSTITUTE 2016

Validity Period: 250 days

₹30500 32.79% OFF

₹20500

4 BHADANIS Institute Coins as Cashback

PREVIEW

Why this course?

Description

Module 1 – Introduction to NRM1 Framework

Objective: Understand the purpose, structure, and role of NRM1 in cost planning and BOQ preparation.
Submodules:

  1. Purpose of NRM1 – Alignment with RICS standards, scope, and industry usage.

  2. Relationship with Cost Management Process – How NRM1 fits from feasibility to final account.

  3. Classification Structure – Work breakdown, group elements, and coding.

  4. Practical Case – Sample high-rise cost plan structured per NRM1.


Module 2 – Understanding BOQ in the NRM1 Context

Objective: Explore how BOQs are structured under NRM1.
Submodules:

  1. Role of BOQ in Cost Planning – Link to design stages.

  2. BOQ Formats under NRM1 – Elemental, work section, and combined formats.

  3. Measurement Principles – Consistency and standard terminology.

  4. Example & Template – Elemental BOQ layout for a G+45 high-rise.


Module 3 – Preliminaries and Project Overheads

Objective: Measure preliminaries in compliance with NRM1.
Submodules:

  1. Definition & Purpose – Temporary works, site setup, and management costs.

  2. Measurement Rules – Preliminaries per NRM1 section 0.

  3. Cost Plan Integration – Linking preliminaries to cost planning stages.

  4. Template – Preliminaries BOQ sheet with example rates.


Module 4 – Measurement of Substructure Works

Objective: Apply NRM1 rules for substructure works.
Submodules:

  1. Scope of Substructure – Foundations, basements, and retaining walls.

  2. Measurement Units – m³, m², item basis.

  3. Worked Example – Raft foundation take-off sheet.

  4. Template – Substructure BOQ with coding.


Module 5 – Measurement of Superstructure Works

Objective: Prepare accurate BOQs for superstructure elements.
Submodules:

  1. Scope of Superstructure – Columns, beams, slabs, walls.

  2. Measurement Rules – Elemental grouping per NRM1.

  3. Worked Example – Slab take-off calculation.

  4. Template – Superstructure BOQ for RC frame.


Module 6 – Measurement of Finishes

Objective: Take-off and cost plan finishes accurately.
Submodules:

  1. Internal Finishes – Floors, walls, ceilings.

  2. External Finishes – Cladding, renders, paints.

  3. Worked Example – Floor tiling BOQ sheet.

  4. Template – Finishes cost plan summary.


Module 7 – Measurement of Fittings, Furnishings & Equipment (FFE)

Objective: Apply NRM1 rules for FFE items.
Submodules:

  1. Scope – Fixed & loose furniture, equipment.

  2. Measurement Units – No., item, set.

  3. Worked Example – Kitchen fit-out BOQ.

  4. Template – FFE schedule with cost integration.


Module 8 – Measurement of Services

Objective: Capture mechanical, electrical, and plumbing works.
Submodules:

  1. Mechanical Systems – HVAC, lifts, escalators.

  2. Electrical Systems – Lighting, power distribution.

  3. Plumbing & Drainage – Water supply, sewage.

  4. Template & Example – MEP BOQ extract.


Module 9 – External Works Measurement

Objective: Apply NRM1 measurement rules to landscaping and site development.
Submodules:

  1. Scope – Roads, pavements, boundary walls.

  2. Measurement Units – m, m², m³, item.

  3. Worked Example – Asphalt paving take-off.

  4. Template – External works BOQ sheet.


Module 10 – Provisional Sums & Prime Cost Items

Objective: Understand provisional and PC items under NRM1.
Submodules:

  1. Definition & Purpose – Allowances for undefined works.

  2. How to Include in BOQ – Formatting rules.

  3. Worked Example – Provisional sum entry for façade system.

  4. Template – BOQ page with provisional & PC items.


Module 11 – Pricing the BOQ

Objective: Turn quantities into a priced cost plan.
Submodules:

  1. Rate Build-Up – Labour, material, plant, overheads.

  2. Market Rate Adjustments – Inflation, location factors.

  3. Worked Example – RC beam rate build-up.

  4. Template – Priced BOQ sheet.


Module 12 – Preparing the Cost Plan

Objective: Consolidate BOQ data into a cost plan per NRM1.
Submodules:

  1. Elemental Cost Analysis – Grouping costs by elements.

  2. Comparative Cost Studies – Benchmarks and historic data.

  3. Worked Example – G+10 office building cost plan.

  4. Template – Elemental cost summary sheet.


Module 13 – Reviewing & Checking the BOQ

Objective: Ensure accuracy and compliance with NRM1.
Submodules:

  1. Common Errors – Omissions, double counting, misclassification.

  2. Cross-Checking Methods – Elemental vs. work section totals.

  3. Worked Example – BOQ reconciliation check.

  4. Template – QA checklist for BOQ.


Module 14 – BOQ in Tendering & Contract Administration

Objective: Use the BOQ as a contractual and financial tool.
Submodules:

  1. Tendering Role – Basis for pricing and negotiation.

  2. Contract Payment – Interim valuations.

  3. Variation Management – Measuring changes from BOQ.

  4. Example – BOQ extract showing variation adjustment.


Module 15 – Final Account & Cost Control with NRM1

Objective: Manage costs post-construction using the BOQ framework.
Submodules:

  1. Final Account Preparation – Reconciling actual vs. BOQ.

  2. Cost Reporting – Periodic updates.

  3. Worked Example – Final account statement for a residential project.

  4. Template – Final account summary sheet.

Course Curriculum

How to Use

After successful purchase, this item would be added to your courses.You can access your courses in the following ways :

  • From the computer, you can access your courses after successful login
  • For other devices, you can access your library using this web app through browser of your device.