BIM MANAGER COURSE LEVEL 4: EXECUTION & RISK LEVEL FOR ARCHTECTS & BIM MANAGER ENGINEERS

BIM MANAGER COURSE LEVEL 4: EXECUTION & RISK LEVEL FOR ARCHTECTS & BIM MANAGER ENGINEERS

Language: ENGLISH

Instructors: BHADANIS BIM QUANTITY SURVEYING TRAINING INSTITUTE FOR ARCHITECTS & BIM MANAGERS ENGINEERS

Validity Period: 365 days

₹25500 50.98% OFF

₹12500

Why this course?

Description

LEVEL 4: EXECUTION & RISK LEVEL

Focus: Quality control, risk control, and dispute prevention
Target audience: Project managers, construction managers, architects, and BIM manager engineers


Course Overview

Level 4 is where projects are either stabilized or damaged.

Most construction problems do not happen because people lack effort. They happen because work begins with unclear information, unchecked risks, and assumptions made under pressure. Once work starts incorrectly, no amount of supervision can fully undo the damage.

This level is designed for professionals who are already managing projects and teams and now need strong execution control, predictable quality, and protection from disputes.

The course trains participants to shift from reactive firefighting to planned execution discipline. Instead of inspecting defects after completion, you learn how to prevent them before the first activity begins. Instead of handling claims later, you learn how clarity and records stop disputes from forming.

This level focuses on how information is used on site, not just how it is created.


MODULE 1: Quality Control Through Information Clarity

Purpose: Stop defects caused by misunderstood drawings and instructions

Quality failures often begin long before workmanship starts. They begin when drawings are read incorrectly, instructions are assumed, or design intent is misunderstood at site level.

This module explains the difference between what the designer intended and what the site actually needs to execute. Many defects occur because drawings show design logic, while site teams need step-by-step clarity.

You will study common quality failures caused by vague notes, missing dimensions, incomplete sections, and coordination gaps. The focus is on learning how to translate drawings into clear, executable site instructions that reduce interpretation errors.


MODULE 2: Pre-Execution Risk Thinking

Purpose: Train the mind to spot risks before work starts

Risk is not only safety-related. Time loss, rework, disputes, and quality failures are also risks.

This module builds a habit of risk thinking before approval, not after failure. You will learn what actually qualifies as a construction risk on site and how risks originate from drawings, sequencing, access, dependencies, and unclear responsibilities.

The module clearly separates design-driven risks from execution-driven risks and explains how managers must assess both before allowing work to start. The goal is to develop a risk-aware approval mindset instead of blind execution pressure.


MODULE 3: Drawing Readiness for Execution

Purpose: Decide whether drawings are fit for site use

Not all approved drawings are ready for execution.

This module teaches how to check whether drawings contain enough information for site teams to work without assumptions. You will learn how to identify missing details, unclear interfaces, and uncoordinated elements before execution begins.

The module also explains how to detect conflicts between disciplines and how to define approval criteria specifically for execution, not just for design sign-off. Participants learn when to stop work and when to seek clarification without delaying the project unnecessarily.


MODULE 4: Quality Control Checkpoints Planning

Purpose: Control quality at the right stages, not at the end

Final inspections cannot fix hidden defects.

This module explains how to plan stage-wise quality checkpoints aligned with execution flow. You will understand where quality must be checked, not just what must be checked.

Hold points and witness points are explained in practical terms, including who should approve what and when. The module also focuses on assigning responsibility clearly at each checkpoint so quality does not become “everyone’s job and nobody’s responsibility”.


MODULE 5: Method Statement Validation

Purpose: Ensure execution methods match design intent

Method statements often get approved without real scrutiny.

This module teaches how to read and validate method statements against drawings and site conditions. You will learn how to link each execution step with design requirements and identify unsafe, impractical, or unbuildable sequences before work starts.

The focus is on preventing execution logic that looks acceptable on paper but fails on site.


MODULE 6: Site Pre-Checks Before Work Starts

Purpose: Eliminate surprises on site

Many delays and disputes happen because work starts in unready areas.

This module covers structured site pre-checks including area readiness, access availability, material verification, and dependency clearance. You will learn how to confirm that prerequisites are complete so work can proceed without interruptions.

The module reinforces that starting early is not the same as starting correctly.


MODULE 7: Risk Mapping by Trade

Purpose: Identify trade-specific failure zones

Each trade carries different risk patterns.

This module maps execution risks for structural works, architectural and finishing works, and services coordination. You will understand typical failure zones, interface risks, and sequencing problems unique to each trade.

By learning trade-wise risk mapping, managers can focus attention where failures are most likely to occur instead of spreading effort blindly.


MODULE 8: Quality Control During Live Execution

Purpose: Control work while it is happening

Quality control is not inspection alone. It is continuous monitoring.

This module explains how to observe workmanship standards during execution, how to detect early warning signs of defects, and when to intervene before damage becomes irreversible.

The importance of timing corrective action is emphasized, showing how early intervention saves time, money, and relationships.


MODULE 9: Change Control at Execution Stage

Purpose: Prevent uncontrolled changes on site

Uncontrolled changes are one of the biggest causes of disputes.

This module teaches how to identify hidden design changes, manage verbal instructions responsibly, and enforce documentation discipline. You will learn how to protect the project by ensuring every change is clear, approved, and traceable.

The module also explains how casual instructions can turn into major claims if not handled properly.


MODULE 10: Rework Prevention Strategies

Purpose: Reduce cost and time loss due to rework

Rework is rarely accidental. It is usually predictable.

This module explains common reasons for rework and how information gaps cause demolition and repetition. You will learn how to plan prevention measures before execution instead of reacting after damage.

The focus is on eliminating root causes rather than blaming workmanship.


MODULE 11: Risk Communication on Site

Purpose: Ensure risks are known, not hidden

Unspoken risks are dangerous risks.

This module explains how to communicate risks clearly to supervisors and teams without creating fear or confusion. You will learn simple daily risk discussion practices and how to ensure risks are recorded, tracked, and followed up.

Clear communication prevents surprises and builds team accountability.


MODULE 12: Execution Records and Traceability

Purpose: Create proof of correct execution

In disputes, records matter more than intentions.

This module explains why execution records are essential and how they should link with drawings and approvals. You will learn what records actually protect managers and organizations when questions arise.

Traceability turns good execution into documented execution.


MODULE 13: Dispute Triggers in Construction

Purpose: Understand how disputes actually start

Disputes rarely start suddenly. They grow silently.

This module explains typical triggers of contractor-client disputes, including unclear scope, incomplete drawings, and inconsistent instructions. You will understand how poor information management creates claims even when work quality is acceptable.

Recognizing early triggers helps prevent escalation.


MODULE 14: Dispute Prevention Through Information Discipline

Purpose: Stop claims before they are born

Prevention is always cheaper than resolution.

This module focuses on clear scope definition during execution, instruction clarity, and approval trails. You will learn how to avoid assumptions and ensure that execution decisions are always backed by clarity.

The emphasis is on disciplined information handling as a managerial responsibility.


MODULE 15: Execution Control as a Managerial Skill

Purpose: Shift from firefighting to control

This final module reframes execution control as a core leadership skill.

You will learn the manager’s role in enforcing execution discipline, balancing speed with quality and risk, and creating a predictable site environment where teams can perform without chaos.

Strong execution control reduces stress, improves trust, and delivers consistent outcomes.


Course Importance for Architects, BIM Managers, and Engineers

For architects, this level bridges the gap between design intent and site reality. It equips them to ensure their designs are executed correctly without repeated clarifications and site conflicts.

For BIM managers, the course strengthens control over information flow during execution, ensuring clarity, coordination, and traceability that protect the project and the organization.

For engineers and project managers, Level 4 provides the structure needed to control quality, manage risks proactively, and avoid disputes that damage schedules and reputations.


Outcome of Level 4

By completing this level, professionals will be able to:

  • Reduce defects and execution failures

  • Identify risks before they reach the site

  • Execute work with clarity and fewer surprises

  • Prevent claims and disputes through disciplined information control

This level transforms experienced professionals into execution leaders who deliver predictable, dispute-free projects.

Course Curriculum

How to Use

After successful purchase, this item would be added to your courses.You can access your courses in the following ways :

  • From the computer, you can access your courses after successful login
  • For other devices, you can access your library using this web app through browser of your device.