Why this course?
Aluminium, Facades & Glassworks Quality Control & Assurance Engineering, Documentation and Management Course
Aluminium & Glass Systems Overview
Types of aluminium profiles, glass units, curtain-wall systems
Key performance parameters (thermal, structural, acoustic)
Standards & codes (EN 1090, ASTM E2190, IS 14225)
Example: Comparison table of Glass IGU types
Quality Management Principles
QC vs QA: definitions and roles
Quality planning: QCP, Inspection Test Plans (ITP)
Document control (DCC) for specs, drawings, procedures
Template: ITP-FAC-01
End-to-End Workflow (“.material aane se jaane tak”)
Factory QC → Dispatch → Site receipt → Installation → Handover
Key touchpoints for inspection & sign-off
Flowchart diagram of process stages
Template: Process Flow – FAC-02
Key Documentation & Records
Material Inspection Report (MIR), Welding Inspection Report (WIR)
Non-Conformance Report (NCR), Non-Performance Observation (NPO)
Holding/Release Certificates (HC Certificate)
Example: MIR-01 sample with fields for dimensions, labels
Incoming Inspection Checklist
Visual defects, dimensional tolerances, surface finish
Sample size & acceptance criteria
Template: Incoming Checklist – FAC-IN-01
Chemical & Mechanical Testing
Alloy verification (spectro analysis)
Hardness, tensile tests for extrusions
Example: Lab Test Report form
Documentation Review
Mill Test Certificate (MTC), Packing List, LPO/NPO issuance
Verifying certificates against specs
Template: MTC Verification Log – FAC-DOC-01
Factory Calibration & Equipment QC
Calibration records for cutting, machining, welding machines
Preventive maintenance schedules
Template: Calibration Log – FAC-CAL-01
Welding Procedure Specification (WPS) & WPQR
Qualifying procedures for aluminium welding
Welding parameters, preheat, filler metal selection
Template: WPS-ALU-01
Welding Inspection & WIR
Visual, dye‐penetrant, ultrasonic inspections
Recording weld size, length, defects
Template: WIR-02 sample
Handling NCRs in Fabrication
Raising NCR/NPO for defects (cracks, porosity)
Root‐cause analysis & corrective action
Template: NCR-03 form
Factory Assembly Checks
Trial assembly of frames, door leaves, façade mock-ups
Gap & tolerance verification
Example: Assembly QC report
Pre-Shipment Inspection (PSI)
Final dimensional, functional checks (operation of doors, drains)
Sealant adhesion, hardware testing
Template: PSI-FAC-04
Packing, Labeling & Protection
Protective films, edge guards, crate marking
Label format for easy site identification
Example: Packing Label sample
Outgoing Checklist
Checklist for item count, accessories, spares
Verifying LPO closure before dispatch
Template: Outgoing Checklist – FAC-OUT-01
Shipping & Logistics Coordination
Handling instructions, moisture barriers
Documentation: BL, AWB, export declarations
Template: Shipping Log
Site Incoming Inspection
Unloading checks, damage assessment
MIR update upon receipt
Template: Site MIR – MIR-SITE-01
Storage & Handling Procedures
Rack layout, weather protection, segregation by project area
Handling heavy frames safely
Example: Site Storage Plan
Material Release & Holding
Issuing HC Certificates for released items
Managing on-hold tags for non-conforming items
Template: HC Certificate form
Site Document Control
Logbooks for MIR, WIR, NCR, NPO
Email tracking for approvals & clarifications
Template: Site Document Register
Pre-Installation Checks
Plumb & level of mullions, base fixing verification
Substrate interface (insulation, waterproofing)
Template: Pre-Install Checklist
Mechanical & Sealant QC
Fastener torque, gasket seating, sealant bead dimensions
Water infiltration & air-leak tests
Example: Field Water Test Report
Alignment & Dimension Control
Diagonal measurements, unit-to-unit tolerances
Shim placement & gap consistency
Template: Alignment Log
Post-Installation Inspection
Functional tests of openings (vent panels, vents)
Final sign-off & punch-list generation
Template: Punch-List Report
Sliding Doors & Windows
Track alignment, roller function, drift & smoothness
Brush seals, weatherstrip checks
Template: Sliding Door QC Form
Shutters, Louvers & Ventilators
Blade angle uniformity, free rotation, locking mechanism
Corrosion protection checks
Example: Louvers Inspection Report
Pergola, Canopy & Balcony Fans
Structural connections, bracket checks, load tests
Fan mounting, electrical safety inspection
Template: Structural Load Test Sheet
Safety & Access QC
Fall-protection anchor points, scaffolding interfaces
Safe access for maintenance
Template: Safety Compliance Checklist
Material Inspection Reports (MIR)
Writing clear MIR emails, attaching photos & test certificates
Template: Email – MIR submission
Welding Inspection Reports (WIR)
Structuring WIR mail: findings, references to WPS/WPQR
Template: Email – WIR submission
Managing NCR/NPO
Communicating non-conformance, tracking closure
Template: NCR notification email
Release Orders (LPO) & Close-Out
Preparing LPO after corrective actions
HC certificate issuance email
Template: Email – LPO release
Implementing QMS for Facades
Key clauses (control of non-conforming outputs, corrective action)
Integration with ISO 9001 / EN 1090
Internal & Third-Party Audits
Audit checklists (factory & site), auditor roles
Reporting audit findings
Corrective & Preventive Actions (CAPA)
Root-cause analysis tools (5 Why, Fishbone)
CAPA plan templates
Continuous Improvement & Lessons Learned
KPIs (PPM, on-time delivery, rework rates)
Weekly QC review meetings
Mock Factory QC Drill
Simulated incoming inspection, NCR generation
Group exercise using MIR-01 / NCR-03 templates
Site Installation Workshop
Curtain wall mock-up assembly, water-leak testing
Completion of site checklists
Root-Cause & CAPA Exercise
Analyze a real NCR case, propose corrective action
Fill CAPA template and present
Final Assessment & Certification
Written exam on key QC docs & procedures
Practical evaluation: write & submit MIR, WIR, NCR emails
After successful purchase, this item would be added to your courses.You can access your courses in the following ways :