Forensic Quantity Surveying (FQS) is not a person—it’s a specialized discipline where construction professionals act as "financial detectives" to resolve high-stakes disputes. FQS experts investigate delays, cost overruns, defects, and breaches of contract, using data-driven analysis to determine liability and quantify losses. Think of them as the bridge between construction chaos and legal clarity.
Delay Analysis Mastery: Learn to dissect schedules using Critical Path Method (CPM), Time Impact Analysis, and Windows Analysis.
Real Tool Application: Use Primavera P6 to prove client-caused delays in a refinery project.
Cost Forensics: Trace budget explosions to design flaws, scope creep, or fraud using invoice auditing and benchmarked rates.
Case Study: Uncover $1.5M in inflated rebar costs using mill price lists.
Defect Liability Assessment: Classify defects by severity, trace causes (design vs. workmanship), and calculate repair costs.
Example: Link balcony cracks to design errors, not construction, saving $2M in wrongful claims.
Cross-Border Enforcement: Master New York Convention tactics to recover debts internationally.
Scenario: Enforce a $10M award against assets in Dubai, Singapore, and London.
Cultural Intelligence: Adapt FQS strategies for hierarchical (GCC) vs. consensus-driven (Scandinavia) project cultures.
Geopolitical Shields: Mitigate sanctions, currency crashes, or force majeure events.
BIM Clash Detection: Resolve design conflicts in 3D models (e.g., hospital MEP clashes).
Drone Data Analysis: Quantify delays using aerial progress imagery.
AI Document Review: Uncover critical evidence in 50,000+ emails using predictive coding.
Courtroom-Ready Reports: Draft bulletproof opinions with visual timelines and plain language.
Cross-Examination Prep: Defend your analysis under scrutiny using verified data trails.
Ethical Frameworks: Navigate conflicts of interest and evidence tampering.
BFQSTI’s program is built on actionable frameworks, not theory:
Templates You’ll Use:
Delay culpability scorecards.
Defect classification matrices.
Quantum calculation models.
Live Case Studies:
Delay Disaster: Prove 60-day delays were client-caused in a power plant, recovering $4.5M.
Defect Showdown: Expose design flaws in luxury condos, shifting $1.6M liability to the design firm.
Industry-Led Training: Courses designed by experts who’ve resolved $1B+ disputes.
Immediate ROI: Apply skills to recover losses in your current projects.
Flexible Learning: 100% online with 24/7 mentor support.
Certification: Earn a credential that validates your expertise to employers and courts.
For Senior Professionals: In an era where 65% of mega-projects face disputes, FQS isn’t just a skill—it’s your career insurance.