Preparing Daily Progress Report [ DPR ] of any Construction Site

A Daily Progress Report (DPR) for a construction site typically includes the following sections:

  1. Project Details: Project name, location, report date, and report number.
  2. Weather Conditions: Information on weather, temperature, and any impact on work.
  3. Work Performed: Detailed description of work completed that day, including labor and equipment used.
  4. Manpower Summary: Number of workers, including trades and subcontractors.
  5. Materials Used: Quantities and types of materials utilized.
  6. Issues and Delays: Any problems encountered or delays.
  7. Safety Incidents: Report of any accidents or safety concerns.
  8. Inspections and Approvals: Details of inspections conducted and approvals received.
  9. Photographs: Images documenting the day's progress.
  10. Signature: Signature of the site manager or engineer.

Format of a Daily Progress Report for a Construction Site

  1. Header:
    • Project Name
    • Location
    • Date
    • Report Number
  2. Weather Conditions:
    • Temperature
    • Weather Description
    • Impact on Work
  3. Work Performed:
    • Detailed Description of Work Completed
    • Equipment and Labor Utilized
  4. Manpower Summary:
    • Number of Workers
    • Trade Categories
    • Subcontractor Details
  5. Materials Used:
    • Quantities and Types of Materials
  6. Issues and Delays:
    • Problems Encountered
    • Reasons for Delays
  7. Safety Incidents:
    • Accident Reports
    • Safety Measures Taken
  8. Inspections and Approvals:
    • Inspection Details
    • Approvals Received
  9. Photographs:
    • Images Documenting Progress
  10. Signatures:
    • Site Manager or Engineer’s Signature