Modes of Measurement in Estimating and Costing

In construction estimating and costing, accurate measurement is key to determining the cost of materials, labor, and overheads. There are several modes or methods used for measurement, each suited for specific project types and conditions. These methods ensure that the quantity and scope of work are accurately captured to estimate project costs effectively.

1. Dimensions Method (Linear Measurement)

  • This method involves measuring the length, width, height, or depth of an object or area. It is commonly used for simple shapes such as walls, columns, beams, and floors.
  • Example: Measuring the length and height of walls to estimate the amount of paint required.

2. Area Method

  • Used for items that involve surface coverage, this method measures the area (square meters or square feet) of surfaces like floors, walls, or ceilings.
  • Example: Estimating the cost of flooring by measuring the area in square meters.

3. Volume Method

  • For solid elements like earthwork, concrete, or masonry, the volume method is used, calculated by multiplying length, breadth, and height (or depth) for irregular structures.
  • Example: Estimating the quantity of earth to be excavated for a foundation.

4. Unit Rate Method

  • This method applies predefined unit rates for each task or activity in the project. The rates include labor, material, and equipment costs.
  • Example: Estimating the cost for laying brickwork, where the unit rate for bricklaying is used based on the number of bricks and labor required.

5. Bill of Quantities (BOQ) Method

  • In this method, quantities of each item in the project are measured and listed in a detailed Bill of Quantities (BOQ), specifying work descriptions and quantities to be performed.
  • Example: The BOQ lists the types and quantities of materials required for the entire project, such as cement, steel, and labor.

6. Rate Analysis Method

  • In this method, the cost of various components (like labor, material, equipment) is calculated separately for each task and then summed up to determine the total cost.
  • Example: Analyzing the rate for concrete work by breaking it down into materials (cement, sand, aggregate) and labor costs.

7. Abstract Method

  • This method involves taking the summary of measurements, adding costs from the Bill of Quantities, and presenting a consolidated summary of the work completed.
  • Example: A summary report of the work performed during the construction of a building, which includes the final quantity of materials used.

8. Plinth Area Method

  • Used for estimating the cost of construction based on the plinth area of a building, this method considers the floor area at ground level (plinth area).
  • Example: Estimating the cost of construction for a residential building based on the floor area measured at the plinth level.

9. Approximate Quantity Method

  • This method is used when there are insufficient details or drawings to measure accurately. It relies on approximate calculations based on similar projects or historical data.
  • Example: Estimating the cost of a building without detailed architectural plans by using unit rates from similar projects.

10. Integrated or Computerized Method

  • The use of specialized software for quantity surveying and cost estimation. This method integrates various modes of measurement, automating the process and improving accuracy and efficiency.
  • Example: Using AutoCAD or Revit for 3D modeling and automated quantity take-offs for faster and more accurate cost estimation.