1. What is IS Code 1200?

Answer: IS Code 1200 is a set of rules that tells us how to measure and calculate the quantities of work done on construction projects, like how much concrete or bricks were used. It helps in making sure everyone agrees on the amount of work.

How BHADANIS helps: BHADANIS will teach you all the important rules of IS Code 1200 so you can measure work correctly and become an expert billing engineer.

2. Why is IS Code 1200 important for a billing engineer?

Answer: It helps billing engineers know the right way to measure the work done and calculate the right amount to pay workers and contractors. Without it, we might make mistakes in calculations.

How BHADANIS helps: BHADANIS’ online training will show you how to use IS Code 1200 effectively, so you can avoid mistakes and do accurate billing.

3. What are the different parts of IS Code 1200?

Answer: IS Code 1200 is divided into different parts based on the type of work, like excavation, brickwork, concrete, etc. Each part tells you how to measure that specific work.

How BHADANIS helps: BHADANIS will break down all the parts of IS Code 1200 and teach you how to apply them in your daily work.

4. What is "Excavation" in IS Code 1200?

Answer: Excavation means digging up the earth for foundations or trenches. IS Code 1200 tells us how to measure how much earth was dug out.

How BHADANIS helps: BHADANIS will teach you how to calculate the right amount of excavation work based on IS Code 1200.

5. What is "Brickwork" according to IS Code 1200?

Answer: Brickwork is the building of walls using bricks. IS Code 1200 tells you how to measure the number of bricks used in the construction.

How BHADANIS helps: BHADANIS will teach you how to calculate brickwork and other construction items correctly using IS Code 1200.

6. How is concrete work measured in IS Code 1200?

Answer: Concrete is measured in cubic meters. IS Code 1200 explains how to calculate the volume of concrete used in different parts of the construction, like slabs and foundations.

How BHADANIS helps: BHADANIS will teach you how to calculate concrete quantities accurately for billing purposes.

7. What is "Carpentry" in IS Code 1200?

Answer: Carpentry refers to woodwork, like making doors or windows. IS Code 1200 tells you how to measure how much wood was used.

How BHADANIS helps: BHADANIS will guide you through measuring carpentry work and help you with proper billing for such work.

8. How is "Steel Reinforcement" measured in IS Code 1200?

Answer: Steel reinforcement is measured by weight. IS Code 1200 explains how to calculate the weight of steel used in the construction.

How BHADANIS helps: BHADANIS will show you how to measure steel reinforcement correctly and calculate the bill for it.

9. What is "Plastering" in IS Code 1200?

Answer: Plastering is the process of applying a smooth coat to walls and ceilings. IS Code 1200 helps you measure how much area was plastered.

How BHADANIS helps: BHADANIS will teach you how to measure plastering and other finishing work correctly, following IS Code 1200.

10. What is "Painting" in IS Code 1200?

Answer: Painting is applying color or protective coating to surfaces. IS Code 1200 guides you on how to measure how much area was painted.

How BHADANIS helps: BHADANIS will teach you how to measure painting work, so you can correctly bill clients for it.


11. How do you calculate the volume of excavation?

Answer: The volume of excavation is calculated by multiplying the length, width, and depth of the excavation.

How BHADANIS helps: BHADANIS will show you how to use this formula in real projects to calculate excavation volumes accurately.

12. What is the importance of a "measurement book"?

Answer: A measurement book is where all measurements of work done are recorded. It ensures that all work is measured properly and helps in payments.

How BHADANIS helps: BHADANIS teaches you how to maintain a proper measurement book, so your work is always organized and accurate.

13. What are "quantities" in construction?

Answer: Quantities are the amount of work done, like how many bricks were used or how much concrete was poured.

How BHADANIS helps: BHADANIS helps you learn how to calculate the right quantities using IS Code 1200.

14. How do you calculate the rate of a work item?

Answer: The rate of a work item is calculated by dividing the total cost of work by the total quantity of work done.

How BHADANIS helps: BHADANIS teaches you how to calculate accurate rates and help prepare bills.

15. What is "Rate Analysis"?

Answer: Rate analysis is the process of breaking down a work item to calculate its cost, including labor, materials, and overheads.

How BHADANIS helps: BHADANIS teaches how to do rate analysis and how to apply it while preparing bills.


16. How are changes in work measured?

Answer: Any changes in the work, like extra work or changes in design, are measured based on the new quantities of work done.

How BHADANIS helps: BHADANIS shows you how to handle extra work or changes using IS Code 1200 and help with accurate billing.

17. What is the "Unit of Measurement" for plastering?

Answer: The unit of measurement for plastering is square meters (m²), which tells us how much area has been covered with plaster.

How BHADANIS helps: BHADANIS teaches how to measure plastering work in square meters and how to prepare the bill for it.

18. How is the work of "Tiles" measured in IS Code 1200?

Answer: The work of tiles is measured by square meters, based on the area covered with tiles.

How BHADANIS helps: BHADANIS will teach you how to measure tiling work and calculate the cost accurately.

19. What is "Bill of Quantities (BOQ)"?

Answer: The Bill of Quantities (BOQ) is a list of all work items with their quantities and costs. It is used to calculate the total cost of a project.

How BHADANIS helps: BHADANIS will show you how to prepare a BOQ, ensuring that all work items are measured and billed correctly.

20. What is "Standard Schedule of Rates (SSR)"?

Answer: The Standard Schedule of Rates is a list of pre-approved rates for different types of work. It helps calculate the cost of common construction tasks.

How BHADANIS helps: BHADANIS will help you understand how to use SSRs in billing and make sure you're using the correct rates.


21. How is work measured in "Site Preparation"?

Answer: Site preparation includes clearing the land, leveling the ground, and setting up the area for construction. It's measured in square meters or cubic meters.

How BHADANIS helps: BHADANIS teaches how to measure site preparation work and calculate the costs accurately.

22. What is the "rate analysis" for concrete work?

Answer: The rate analysis for concrete work includes costs for materials like cement, sand, and labor for mixing and pouring concrete.

How BHADANIS helps: BHADANIS will teach you how to calculate the rate of concrete work by breaking down all the costs.



23. What is the unit of measurement for earth filling in embankments?

Answer: Earth filling in embankments is measured in cubic meters (m³). This tells us how much earth has been used to fill up the embankment.

How BHADANIS helps: BHADANIS will teach you how to measure earth filling work accurately and help you prepare bills using the correct units.

24. How is "Formwork" measured?

Answer: Formwork is the temporary structure used to shape concrete until it hardens. It is measured in square meters (m²) for walls, slabs, and other surfaces.

How BHADANIS helps: BHADANIS will teach you the process of measuring formwork and how to prepare accurate bills for it.

25. What is the measurement unit for "Shuttering" in IS Code 1200?

Answer: Shuttering, or formwork, is also measured in square meters (m²) for the surface area that needs to be covered by the shuttering material.

How BHADANIS helps: BHADANIS will help you understand the difference between formwork and shuttering and teach you how to measure both effectively.

26. What is the "method of measurement" for columns in IS Code 1200?

Answer: Columns are measured by the cubic meter (m³) for the concrete volume used in the column, including the reinforcement.

How BHADANIS helps: BHADANIS will teach you how to calculate the volume of concrete for columns and other structural elements correctly.

27. What is "Wet Mix Macadam" in IS Code 1200?

Answer: Wet Mix Macadam (WMM) is a type of road construction material used for the base of roads. It is measured in cubic meters (m³).

How BHADANIS helps: BHADANIS will guide you through the process of measuring Wet Mix Macadam work and help you calculate the costs involved.

28. How do you calculate "Backfilling" in IS Code 1200?

Answer: Backfilling is the process of filling soil or other materials back into an excavation after the work is done. It is measured in cubic meters (m³).

How BHADANIS helps: BHADANIS will teach you how to calculate the quantity of backfilling and help with billing for such work.

29. How is "Bituminous Work" measured?

Answer: Bituminous work, like laying asphalt on roads, is measured in square meters (m²) or tons, depending on the type of work.

How BHADANIS helps: BHADANIS will show you how to measure bituminous work and ensure accurate billing based on IS Code 1200.

30. What is the measurement unit for "Masonry Work"?

Answer: Masonry work, like building walls with stones or bricks, is typically measured in cubic meters (m³) or square meters (m²) for the surface area.

How BHADANIS helps: BHADANIS will explain the different ways of measuring masonry work and help you accurately prepare bills.

31. What is "Ground Improvement" in IS Code 1200?

Answer: Ground improvement refers to techniques used to make the ground more stable for construction. It is usually measured in cubic meters (m³) or square meters (m²).

How BHADANIS helps: BHADANIS teaches the methods used in ground improvement and how to calculate the quantities for billing purposes.

32. How is "Dewatering" work measured?

Answer: Dewatering work, which is the process of removing water from excavations, is measured in cubic meters (m³) or based on the number of hours of dewatering equipment used.

How BHADANIS helps: BHADANIS will show you how to measure dewatering work and make sure the billing is accurate.

33. What is the unit of measurement for "Road Marking"?

Answer: Road marking is measured in linear meters (m) for the length of the markings or square meters (m²) for the area covered by paint.

How BHADANIS helps: BHADANIS teaches how to measure road marking work based on the unit of measurement and calculate the associated costs.

34. How do you measure "Plumbing Work" in IS Code 1200?

Answer: Plumbing work is measured in linear meters (m) for the length of pipes laid or in numbers for fixtures installed, like taps or toilets.

How BHADANIS helps: BHADANIS will help you measure plumbing work correctly and prepare the billing with accuracy.

35. What is the "measurement unit" for "Electrical Wiring" work?

Answer: Electrical wiring work is measured in meters (m) for the length of cables laid or the number of fixtures installed.

How BHADANIS helps: BHADANIS will guide you through the process of measuring electrical wiring work and help you prepare accurate bills.

36. How do you calculate "Waterproofing" work?

Answer: Waterproofing is measured in square meters (m²) of surface area treated with a waterproofing material.

How BHADANIS helps: BHADANIS will teach you the methods for calculating waterproofing quantities and help you with billing.

37. What is the measurement unit for "Drainage Work"?

Answer: Drainage work is typically measured in linear meters (m) for the length of the drains constructed or cubic meters (m³) for the volume of the excavated material.

How BHADANIS helps: BHADANIS will teach you how to calculate drainage work quantities and prepare billing accordingly.

38. How is "Steel Fixing" measured?

Answer: Steel fixing is measured in kilograms (kg) or tons (T) for the amount of reinforcement steel used in construction.

How BHADANIS helps: BHADANIS will guide you on how to measure the weight of steel reinforcement and calculate the correct billing.

39. What is the "measurement unit" for "Excavation of Trenches"?

Answer: Excavation of trenches is measured in cubic meters (m³) based on the volume of earth removed.

How BHADANIS helps: BHADANIS will explain how to measure trench excavation accurately and ensure correct billing.

40. What is the difference between "Lump Sum" and "Item Rate" contracts in billing?

Answer: Lump sum contracts give a fixed price for all work, while item rate contracts pay based on the amount of work done, like per square meter or cubic meter.

How BHADANIS helps: BHADANIS will teach you how to handle both types of contracts and make sure your bills are prepared accordingly.


41. How is "Earthwork in Cutting" measured?

Answer: Earthwork in cutting is measured in cubic meters (m³) for the volume of soil removed from the ground.

How BHADANIS helps: BHADANIS will teach you how to calculate the earthwork in cutting accurately using IS Code 1200.

42. What is the "measurement unit" for "Fencing Work"?

Answer: Fencing work is measured in linear meters (m) based on the length of the fence constructed.

How BHADANIS helps: BHADANIS will teach you how to measure fencing work and prepare billing for it accurately.


BHADANIS Training for Billing Engineers:

The online training from BHADANIS Quantity Surveyors Training Institute will help you learn how to use IS Code 1200 to measure, calculate, and prepare bills for all types of construction work. Whether it’s for simple tasks like measuring brickwork or complex ones like calculating dewatering work, you will become proficient in using the correct units of measurement, rate analysis, and preparing accurate Bills of Quantities (BOQ). With BHADANIS’ guidance, you’ll learn how to handle every aspect of billing engineering, ensuring you can work confidently and correctly in construction projects.


43. How is "Concrete Flooring" measured?

Answer: Concrete flooring is measured in square meters (m²) based on the area of the floor covered with concrete.

How BHADANIS helps: BHADANIS will show you how to measure concrete flooring accurately and prepare the corresponding bill.

44. What is the unit of measurement for "Stone Pitching"?

Answer: Stone pitching, used for building walls or surfaces with stones, is measured in square meters (m²) based on the area covered.

How BHADANIS helps: BHADANIS will help you understand how to measure stone pitching and use IS Code 1200 to calculate costs.

45. How do you measure "Compaction" in road construction?

Answer: Compaction work in road construction is measured in cubic meters (m³) based on the volume of material compacted.

How BHADANIS helps: BHADANIS will explain the process of measuring compaction work and guide you in preparing bills accurately.

46. How is "Grading of Soil" measured?

Answer: Grading of soil is typically measured in cubic meters (m³) based on the volume of soil that is reshaped or leveled.

How BHADANIS helps: BHADANIS will teach you how to measure grading of soil correctly and calculate the corresponding billing amounts.

47. What is "Steel Fabrication" in IS Code 1200?

Answer: Steel fabrication refers to the process of shaping and joining steel for structural work, and it's measured in kilograms (kg) or tons (T) for the weight of steel used.

How BHADANIS helps: BHADANIS will show you how to measure steel fabrication work, which is important for preparing accurate bills.

48. What is the measurement unit for "Cement" in IS Code 1200?

Answer: Cement is measured in bags or kilograms (kg) depending on how it is supplied.

How BHADANIS helps: BHADANIS will teach you how to calculate the quantity of cement used in construction and prepare bills based on correct measurements.

49. How do you measure "Water Tank Construction"?

Answer: Water tank construction is measured in cubic meters (m³) for the volume of concrete used, including the structure and the base.

How BHADANIS helps: BHADANIS will guide you through measuring water tank construction accurately and calculating the bill.

50. How is "Excavation for Foundation" measured?

Answer: Excavation for foundation is measured in cubic meters (m³) based on the volume of earth removed from the foundation area.

How BHADANIS helps: BHADANIS will explain how to measure excavation for foundations properly and teach you how to calculate the quantities.

51. What is "Backfilling in Trenches" and how is it measured?

Answer: Backfilling in trenches is the process of filling the trench after laying pipes or cables. It is measured in cubic meters (m³).

How BHADANIS helps: BHADANIS will teach you how to measure backfilling in trenches and prepare accurate bills based on the work done.

52. How is "Road Construction" measured?

Answer: Road construction involves multiple components like sub-base, base, and surface layers. These components are measured in cubic meters (m³) or square meters (m²), depending on the work type.

How BHADANIS helps: BHADANIS will explain how to measure all aspects of road construction and help you calculate accurate billing amounts.

53. How do you measure "Reinforced Concrete Work"?

Answer: Reinforced concrete work is measured by the cubic meter (m³), including both concrete volume and the reinforcement steel.

How BHADANIS helps: BHADANIS will show you how to measure reinforced concrete work accurately and help with the billing process.

54. What is the "measurement unit" for "Timber Work"?

Answer: Timber work is measured in cubic meters (m³) for the volume of timber used in construction.

How BHADANIS helps: BHADANIS will guide you through measuring timber work and preparing the billing accordingly.

55. How is "Foundation Work" measured in IS Code 1200?

Answer: Foundation work is typically measured in cubic meters (m³) for the volume of earth removed and the amount of concrete used for the foundation.

How BHADANIS helps: BHADANIS will help you measure foundation work and teach you how to calculate costs for such tasks.

56. What is "Dry Lean Concrete" in road construction?

Answer: Dry Lean Concrete (DLC) is used for road base layers and is measured in cubic meters (m³) based on the volume of concrete laid.

How BHADANIS helps: BHADANIS will teach you how to calculate DLC quantities and prepare accurate bills.

57. How do you measure "Soil Stabilization"?

Answer: Soil stabilization, used to improve soil quality for construction, is measured in cubic meters (m³) for the volume of treated soil.

How BHADANIS helps: BHADANIS will show you how to measure soil stabilization and ensure your bills are correct.

58. What is the "measurement unit" for "RCC Drain Construction"?

Answer: RCC (Reinforced Cement Concrete) drain construction is measured in cubic meters (m³) based on the volume of concrete used.

How BHADANIS helps: BHADANIS will explain how to measure RCC drain work accurately and prepare your billing based on the measurements.

59. What is "Excavation in Hard Rock"?

Answer: Excavation in hard rock is the process of digging through solid rock. It is measured in cubic meters (m³), and it requires more effort, so the rates might be higher.

How BHADANIS helps: BHADANIS will teach you how to measure excavation in hard rock and calculate the billing rates based on IS Code 1200.

60. How do you calculate "Quarrying of Stone"?

Answer: Quarrying of stone is measured in cubic meters (m³) or tons (T), depending on the measurement method.

How BHADANIS helps: BHADANIS will explain the proper methods for measuring quarrying work and help you prepare accurate bills.


61. What is the measurement unit for "Paving Blocks"?

Answer: Paving blocks are measured in square meters (m²) for the area they cover.

How BHADANIS helps: BHADANIS will help you measure paving blocks correctly and ensure accurate billing based on IS Code 1200.

62. How do you measure "Waterproofing for Roofs"?

Answer: Waterproofing for roofs is measured in square meters (m²) based on the surface area treated.

How BHADANIS helps: BHADANIS will show you how to measure waterproofing work and prepare accurate billing for such work.

63. What is the "measurement unit" for "Filling Material"?

Answer: Filling material is measured in cubic meters (m³) for the volume of material used to fill spaces or voids.

How BHADANIS helps: BHADANIS will guide you through measuring filling material and help you prepare the correct billing for it.

64. How is "Piling Work" measured?

Answer: Piling work is measured by the number of piles installed or by the linear meter (m) of pile depth.

How BHADANIS helps: BHADANIS will teach you how to measure piling work and calculate the correct amount for billing purposes.

65. How is "Dismantling Work" measured?

Answer: Dismantling work is measured in cubic meters (m³) for the volume of material that has been removed or demolished.

How BHADANIS helps: BHADANIS will show you how to measure dismantling work and ensure the billing is accurate.


BHADANIS Training for Billing Engineers:

The online training from BHADANIS Quantity Surveyors Training Institute will equip you with the skills and knowledge needed to apply IS Code 1200 to measure, calculate, and prepare accurate bills for all types of construction work. You'll learn the correct methods for measuring everything from road construction to electrical wiring and dismantling work. By the end of the training, you will confidently be able to handle all aspects of billing engineering, making sure that you follow IS Code 1200 properly and avoid costly mistakes.


66. How do you measure "Reinforcement in Concrete" work?

Answer: Reinforcement in concrete work is measured by the weight of the steel used. It is measured in kilograms (kg) or tons (T), depending on the volume of reinforcement.

How BHADANIS helps: BHADANIS will show you how to accurately measure the steel reinforcement used in concrete and guide you through the billing process.

67. What is "Dry Lean Concrete (DLC)" and how is it measured?

Answer: Dry Lean Concrete (DLC) is used for road bases. It is measured in cubic meters (m³), which tells us the volume of concrete used.

How BHADANIS helps: BHADANIS will help you measure Dry Lean Concrete work and ensure proper billing by teaching you the correct methods to calculate quantities.

68. What is the unit of measurement for "Curing of Concrete"?

Answer: Curing of concrete is usually measured by the square meter (m²) of the surface that needs to be cured.

How BHADANIS helps: BHADANIS will guide you through measuring curing work and help you prepare accurate billing amounts.

69. How is "Excavation in Soft Soil" measured?

Answer: Excavation in soft soil is measured in cubic meters (m³) based on the volume of soil removed.

How BHADANIS helps: BHADANIS will explain how to calculate the excavation in soft soil and how to prepare the correct billing.

70. What is the unit of measurement for "Concrete Block Work"?

Answer: Concrete block work is measured in square meters (m²) for the area of the wall constructed or in cubic meters (m³) for the volume of blocks used.

How BHADANIS helps: BHADANIS will teach you how to measure concrete block work accurately and guide you in preparing a precise bill.

71. How is "Masonry Work" measured in IS Code 1200?

Answer: Masonry work is measured by cubic meters (m³) for the volume of stone or brickwork constructed.

How BHADANIS helps: BHADANIS will show you how to measure masonry work and how to calculate the corresponding billing amounts accurately.

72. How is "Formwork for Slabs" measured?

Answer: Formwork for slabs is measured in square meters (m²) for the area covered by the formwork.

How BHADANIS helps: BHADANIS will teach you how to measure formwork for slabs and help you prepare the correct billing for it.

73. What is the unit of measurement for "Precast Concrete"?

Answer: Precast concrete is measured in cubic meters (m³) based on the volume of the precast elements.

How BHADANIS helps: BHADANIS will help you measure precast concrete and guide you through the billing process to ensure accurate payments.

74. How do you measure "Reinforced Concrete Pipe" installation?

Answer: Reinforced concrete pipe installation is measured by linear meters (m) based on the length of pipe installed.

How BHADANIS helps: BHADANIS will teach you how to measure reinforced concrete pipe installation and how to calculate the bill for it.

75. How is "Gravel Work" measured?

Answer: Gravel work is measured in cubic meters (m³) or tons (T), depending on the measurement method used.

How BHADANIS helps: BHADANIS will explain how to measure gravel work and assist you in preparing accurate bills based on the measurements.

76. What is "Plastering Work" in IS Code 1200?

Answer: Plastering work is measured by square meters (m²), based on the surface area covered with plaster.

How BHADANIS helps: BHADANIS will show you how to measure plastering work and calculate accurate billing amounts.

77. How is "Tiling Work" measured?

Answer: Tiling work is measured by square meters (m²), based on the area of the surface tiled.

How BHADANIS helps: BHADANIS will teach you how to measure tiling work and ensure that the billing is done correctly.

78. What is "Paving Work" and how is it measured?

Answer: Paving work is the installation of materials like stones or tiles on walkways, and it is measured in square meters (m²).

How BHADANIS helps: BHADANIS will help you measure paving work correctly and calculate the cost for accurate billing.

79. How is "Plumbing Fittings" work measured?

Answer: Plumbing fittings like taps, basins, or pipes are measured in numbers, as each item installed is counted.

How BHADANIS helps: BHADANIS will teach you how to measure plumbing fittings and help you prepare bills for such work.

80. How do you measure "Survey Work"?

Answer: Survey work is typically measured in terms of the area surveyed (square meters or square kilometers) or the length of the survey (linear meters).

How BHADANIS helps: BHADANIS will guide you through measuring survey work and calculating the corresponding billing amount accurately.

81. How is "Excavation for Pits" measured?

Answer: Excavation for pits is measured in cubic meters (m³), based on the volume of earth removed from the pit.

How BHADANIS helps: BHADANIS will show you how to calculate the excavation work for pits and ensure correct billing.

82. What is the "measurement unit" for "Stone Masonry"?

Answer: Stone masonry work is usually measured in cubic meters (m³), depending on the volume of stonework completed.

How BHADANIS helps: BHADANIS will teach you how to measure stone masonry and prepare accurate bills using IS Code 1200.

83. How is "Mechanical Work" measured?

Answer: Mechanical work, such as the installation of HVAC systems, is measured in terms of unit counts for each item (e.g., air conditioners, fans), or linear meters for piping.

How BHADANIS helps: BHADANIS will guide you in measuring mechanical work correctly and help you prepare the corresponding bills.

84. How do you measure "Brickwork"?

Answer: Brickwork is measured in cubic meters (m³) for the volume of bricks used or square meters (m²) for the area of the wall.

How BHADANIS helps: BHADANIS will show you how to measure brickwork and calculate the quantities accurately for billing.

85. How is "Excavation for Trenches" measured?

Answer: Excavation for trenches is measured in cubic meters (m³) based on the volume of earth excavated.

How BHADANIS helps: BHADANIS will guide you through the excavation of trenches and teach you how to calculate the cost for billing purposes.

86. What is "Soil Testing" and how is it measured?

Answer: Soil testing is usually measured in numbers for each test performed, such as compaction tests or permeability tests.

How BHADANIS helps: BHADANIS will explain the process of soil testing and show you how to measure and bill for soil testing work.

87. How do you measure "Asphalt Work"?

Answer: Asphalt work, typically used in road construction, is measured in tons (T) or cubic meters (m³), depending on the type of work.

How BHADANIS helps: BHADANIS will teach you how to measure asphalt work and calculate the billing accurately.

88. What is "Firefighting System Installation" and how is it measured?

Answer: Firefighting system installation, such as sprinklers and hydrants, is usually measured in unit counts (each fixture) or linear meters of pipe installed.

How BHADANIS helps: BHADANIS will show you how to measure firefighting system installations and help you prepare the bill for it.

89. How is "HVAC Installation" measured?

Answer: HVAC installation is typically measured in square meters (m²) for ducts or in unit counts for each machine (like air conditioning units).

How BHADANIS helps: BHADANIS will guide you through measuring HVAC installations and ensure accurate billing.

90. What is the "measurement unit" for "Cable Laying"?

Answer: Cable laying is usually measured in linear meters (m) for the length of cable installed.

How BHADANIS helps: BHADANIS will show you how to measure cable laying and calculate the corresponding bill accurately.


BHADANIS Training for Billing Engineers

BHADANIS Quantity Surveyors Training Institute offers online courses designed to equip you with the knowledge and skills needed to apply IS Code 1200 in the billing process. Whether it’s for measuring quantities like brickwork, excavation, or complex mechanical systems like HVAC, BHADANIS provides clear, step-by-step guidance to help you measure accurately, prepare precise bills, and manage your billing tasks like a pro. The training is structured to ensure that you understand not just the measurements but the reasoning behind them, making you a confident and efficient billing engineer.


91. How is "Soil Embankment" work measured?

Answer: Soil embankment is measured in cubic meters (m³) for the volume of soil used to create an embankment.

How BHADANIS helps: BHADANIS will show you how to measure soil embankment work and teach you how to prepare accurate billing for this type of work.

92. What is the measurement unit for "Piling Work"?

Answer: Piling work is measured by the number of piles driven into the ground or by linear meters (m) for the depth of piles.

How BHADANIS helps: BHADANIS will guide you on how to calculate the number of piles and their depth for accurate billing.

93. How is "Bituminous Macadam Work" measured?

Answer: Bituminous macadam work is typically measured in tons (T) or cubic meters (m³) depending on the density of the material used.

How BHADANIS helps: BHADANIS will explain how to measure bituminous macadam and help you with the corresponding billing calculations.

94. What is "RCC Structure" and how is it measured?

Answer: RCC (Reinforced Cement Concrete) structures are measured in cubic meters (m³) based on the volume of concrete used in the structure.

How BHADANIS helps: BHADANIS will show you how to calculate the volume of RCC structures and prepare billing for it.

95. How do you measure "Filling in Trenches"?

Answer: Filling in trenches is measured in cubic meters (m³) based on the volume of material used to backfill the trench.

How BHADANIS helps: BHADANIS will guide you through measuring the filling in trenches and ensure accurate billing.

96. How is "Gravel Road Construction" measured?

Answer: Gravel road construction is measured in cubic meters (m³) for the volume of gravel used or in square meters (m²) for the surface area covered.

How BHADANIS helps: BHADANIS will teach you how to calculate gravel road construction quantities and bill them accurately.

97. What is the measurement unit for "Slab Formwork"?

Answer: Slab formwork is measured in square meters (m²) for the area covered by the formwork material.

How BHADANIS helps: BHADANIS will explain how to measure slab formwork and guide you through the billing process.

98. How do you measure "Paving Work for Roads"?

Answer: Paving work for roads is typically measured in square meters (m²) based on the area covered by the paving material.

How BHADANIS helps: BHADANIS will show you how to measure road paving work and help with accurate billing for this work.

99. What is "Construction of Retaining Wall" and how is it measured?

Answer: Retaining wall construction is measured in cubic meters (m³) based on the volume of concrete used for the wall.

How BHADANIS helps: BHADANIS will guide you in measuring retaining walls and calculating the correct billing for them.

100. How is "Excavation for Cable Trenches" measured?

Answer: Excavation for cable trenches is measured in cubic meters (m³), based on the volume of earth removed for laying cables.

How BHADANIS helps: BHADANIS will teach you how to calculate excavation work for cable trenches and prepare accurate bills.


101. What is "Concrete Road Work" and how is it measured?

Answer: Concrete road work is measured in cubic meters (m³) for the volume of concrete used in constructing the road.

How BHADANIS helps: BHADANIS will guide you through measuring concrete road work and teach you how to prepare precise billing for it.

102. How is "Demolition Work" measured?

Answer: Demolition work is measured in cubic meters (m³) or tons (T), depending on the type of material removed from the site.

How BHADANIS helps: BHADANIS will show you how to calculate the amount of demolition work done and help with the billing process.

103. How do you measure "Excavation for Basement"?

Answer: Excavation for basement is measured in cubic meters (m³) for the volume of earth excavated to create the basement.

How BHADANIS helps: BHADANIS will teach you how to measure excavation for basements and ensure correct billing.

104. What is "RCC Beam Work" and how is it measured?

Answer: RCC beam work is measured in cubic meters (m³) based on the volume of concrete used for the beams.

How BHADANIS helps: BHADANIS will explain how to measure RCC beams and help you prepare billing for such work.

105. How do you measure "Turfing Work"?

Answer: Turfing work is measured in square meters (m²) for the area of grass or turf laid in the landscaping area.

How BHADANIS helps: BHADANIS will teach you how to measure turfing work and guide you on preparing bills accurately.

106. How is "PCC (Plain Cement Concrete)" work measured?

Answer: PCC work is measured in cubic meters (m³) for the volume of concrete used in non-reinforced concrete work.

How BHADANIS helps: BHADANIS will show you how to calculate PCC quantities and prepare the corresponding bills.

107. What is "Mild Steel Reinforcement" and how is it measured?

Answer: Mild steel reinforcement is measured by weight, usually in kilograms (kg) or tons (T).

How BHADANIS helps: BHADANIS will teach you how to measure mild steel reinforcement and ensure correct billing based on its weight.

108. How is "Stone Pitching for River Protection" measured?

Answer: Stone pitching for river protection is measured in square meters (m²) based on the area covered by the stones.

How BHADANIS helps: BHADANIS will guide you in measuring stone pitching for river protection and help you prepare the accurate billing.

109. How is "Excavation for Drainage Work" measured?

Answer: Excavation for drainage work is measured in cubic meters (m³) for the volume of earth removed to lay drains.

How BHADANIS helps: BHADANIS will show you how to calculate excavation for drainage work and ensure accurate billing.

110. How is "Construction of Culverts" measured?

Answer: Construction of culverts is measured in cubic meters (m³) based on the volume of concrete used for the culvert.

How BHADANIS helps: BHADANIS will explain how to measure culvert construction and help you prepare the corresponding bill.