Comprehensive Guide to Mivan Shuttering Formwork Estimation, Budgeting, and Management

The Mivan Shuttering Formwork Estimation, Budgeting, and Management course by BHADANIS QUANTITY SURVEYING AND ESTIMATION BILLING PLANNING TRAINING INSTITUTE is a specialized program tailored for civil engineers, site supervisors, and construction professionals. This course equips learners with advanced skills to manage Mivan shuttering—a modern aluminum formwork system widely used in high-rise projects like G+45 buildings. Below is a detailed breakdown of the curriculum, learning outcomes, and practical applications.


Course Overview

  • Language: English

  • Validity: 120 days of access

  • Admission Process:

    1. Purchase the course and access recorded lectures.

    2. Submit identification via WhatsApp (+918603333379).

    3. Receive trainer support for doubt resolution via Zoom.

    4. Access placement assistance for up to 1 year.


Key Modules and Learning Objectives

1. Introduction to Mivan Shuttering

  • What is Mivan Shuttering?: A lightweight, reusable aluminum formwork system for casting walls, columns, slabs, and beams in reinforced concrete (RCC) structures.

  • Applications: Ideal for high-rise buildings (e.g., G+45), mass housing, and projects requiring rapid construction.

  • Case Study: Analyzing a G+45 residential tower where Mivan shuttering reduced construction time by 40%.

2. Components of Mivan Formwork

  • Core Components: Panels, beams, props, pins, wedges, and spacers.

  • Example: Calculating the number of wall panels required for a 30m x 20m building layout.

  • Material Optimization: Reusing panels across multiple floors to minimize costs.

3. Estimation Techniques

  • Shuttering Area Calculation:

    • Formula: Total Area = Perimeter × Height for vertical elements like columns.

    • Example: Estimating formwork area for a 5m-high shear wall spanning 15m.

  • Material Quantification:

    • Panels: Determine panel count based on structural drawings.

    • Props: Calculate vertical supports needed for slabs and beams.

4. Budgeting and Cost Management

  • Rate Analysis:

    • Material Costs: Aluminum panels (₹1,200–₹1,500/sq.m), props (₹150–₹200/day).

    • Labor Costs: Installation and dismantling charges per square meter.

  • Case Study: Budgeting for a G+20 commercial complex with a total shuttering cost of ₹2.8 crore.

5. Design and Safety Standards

  • Compliance: Adhering to IS 456 (concrete construction) and IS 14687 (formwork safety).

  • Safety Protocols: Ensuring stability during high-altitude installations.

6. Practical Applications

  • Lift Core and Staircases: Customizing panels for complex shapes like curved staircases.

  • Parapet Walls: Estimating formwork for 1m-high parapets on rooftop slabs.

  • Material Reconciliation: Tracking panel usage to reduce wastage by 15–20%.

7. Sustainability and Reusability

  • Recycling: Reusing panels for 200+ cycles, reducing environmental impact.

  • Cost Savings: Lowering per-unit costs by 30% through optimized reuse.


Career Opportunities After Completion

  • Job Roles: Mivan Formwork Engineer, Site Supervisor, Estimation Specialist.

  • Industries: High-rise construction, infrastructure development, real estate.


Why Choose This Course?

  • Industry-Driven Curriculum: Covers estimation, budgeting, and on-site management.

  • Practical Exercises: Real-world examples from G+45 projects.

  • Flexible Learning: Self-paced recorded lectures with Zoom-based mentorship.


How to Enroll

Visit Mivan Shuttering Formwork Course or call +918603333379 for details.


Fri May 23, 2025

Pop-Up Message
Call Us CALL US !