There are no items in your cart
Add More
Add More
Item Details | Price |
---|
The Mivan Shuttering Formwork Estimation, Budgeting, and Management course by BHADANIS QUANTITY SURVEYING AND ESTIMATION BILLING PLANNING TRAINING INSTITUTE is a specialized program tailored for civil engineers, site supervisors, and construction professionals. This course equips learners with advanced skills to manage Mivan shuttering—a modern aluminum formwork system widely used in high-rise projects like G+45 buildings. Below is a detailed breakdown of the curriculum, learning outcomes, and practical applications.
Language: English
Validity: 120 days of access
Admission Process:
Purchase the course and access recorded lectures.
Submit identification via WhatsApp (+918603333379).
Receive trainer support for doubt resolution via Zoom.
Access placement assistance for up to 1 year.
What is Mivan Shuttering?: A lightweight, reusable aluminum formwork system for casting walls, columns, slabs, and beams in reinforced concrete (RCC) structures.
Applications: Ideal for high-rise buildings (e.g., G+45), mass housing, and projects requiring rapid construction.
Case Study: Analyzing a G+45 residential tower where Mivan shuttering reduced construction time by 40%.
Core Components: Panels, beams, props, pins, wedges, and spacers.
Example: Calculating the number of wall panels required for a 30m x 20m building layout.
Material Optimization: Reusing panels across multiple floors to minimize costs.
Shuttering Area Calculation:
Formula: Total Area = Perimeter × Height for vertical elements like columns.
Example: Estimating formwork area for a 5m-high shear wall spanning 15m.
Material Quantification:
Panels: Determine panel count based on structural drawings.
Props: Calculate vertical supports needed for slabs and beams.
Rate Analysis:
Material Costs: Aluminum panels (₹1,200–₹1,500/sq.m), props (₹150–₹200/day).
Labor Costs: Installation and dismantling charges per square meter.
Case Study: Budgeting for a G+20 commercial complex with a total shuttering cost of ₹2.8 crore.
Compliance: Adhering to IS 456 (concrete construction) and IS 14687 (formwork safety).
Safety Protocols: Ensuring stability during high-altitude installations.
Lift Core and Staircases: Customizing panels for complex shapes like curved staircases.
Parapet Walls: Estimating formwork for 1m-high parapets on rooftop slabs.
Material Reconciliation: Tracking panel usage to reduce wastage by 15–20%.
Recycling: Reusing panels for 200+ cycles, reducing environmental impact.
Cost Savings: Lowering per-unit costs by 30% through optimized reuse.
Job Roles: Mivan Formwork Engineer, Site Supervisor, Estimation Specialist.
Industries: High-rise construction, infrastructure development, real estate.
Industry-Driven Curriculum: Covers estimation, budgeting, and on-site management.
Practical Exercises: Real-world examples from G+45 projects.
Flexible Learning: Self-paced recorded lectures with Zoom-based mentorship.
Visit Mivan Shuttering Formwork Course or call +918603333379 for details.
Fri May 23, 2025