Construction projects are inherently complex, with multiple stakeholders, tight deadlines, and high financial stakes. Disputes and claims—whether over delays, cost overruns, or contractual ambiguities—are inevitable. The Advanced Construction Claims Tactics for Professionals course by BHADANIS Quantity Surveying Training Institute equips construction managers, contractors, and engineers with the expertise to navigate these challenges effectively. Below is a detailed breakdown of the curriculum, strategies, and practical applications covered in this program.
Language: English
Validity: 120 days of access
Admission Process:
Purchase the course and access recorded lectures.
Submit identification via WhatsApp (+918603333379).
Receive Zoom-based mentorship for doubt resolution.
Access placement support for up to 1 year.
Types of Claims: Delay claims, variation orders, force majeure, and defective work disputes.
Example: A delay claim due to late material deliveries in a highway project, leading to a ₹2 crore cost overrun.
Legal Frameworks: Overview of FIDIC, NEC, and local contract laws governing claims.
Critical Records: Daily reports, meeting minutes, photographs, and correspondence.
Case Study: Using time-stamped photos to prove defective plumbing work in a residential complex.
Quantifying Losses: Calculating extended overheads, idle labor, and equipment costs.
Formula: Claim Amount = Direct Costs + Overheads + Profit Margin.
Persuasive Narratives: Structuring claims with clear cause-effect relationships.
Mediation Strategies: Facilitating compromise without litigation.
Example: Resolving a ₹50 lakh variation dispute over additional HVAC ducting through mediated negotiation.
Arbitration and Litigation: When to escalate and how to prepare evidence for legal proceedings.
Risk Mitigation: Clarifying ambiguous contract terms during tender stages.
Case Study: Revising a boilerplate contract to specify "monsoon delays" as excusable, saving ₹1.2 crore in penalties.
Delay Analysis: Assessing critical path impacts in a delayed hospital project.
Variation Orders: Quantifying costs for client-requested design changes in a commercial tower.
Job Roles: Claims Manager, Contract Administrator, Dispute Resolution Specialist.
Industries: Infrastructure, real estate, oil and gas, public works.
Industry-Driven Curriculum: Covers FIDIC clauses, delay analysis, and negotiation tactics.
Practical Training: Real-world examples from highway, residential, and industrial projects.