arrow_back
MODULE 1: Introduction to Firefighting BOQ Preparation
1-Firefighting-BOQ-Preparation-for-High-Rise-Buildings
Role of BOQ in firefighting works and project control
Scope of firefighting works in residential, commercial, and industrial projects
Common mistakes made while preparing firefighting quantities
MODULE 2: Understanding Firefighting Drawings and Layouts
2-Firefighting-BOQ-Preparation-for-High-Rise-Buildings
Reading firefighting layout plans and riser diagrams
Identifying system coverage areas floor-wise
Coordination between firefighting layouts and civil drawings
MODULE 3: Fire Water Storage and Pump Room Quantities
3-Fire-Water-Storage-and-Pump-Room-Quantities
Underground and overhead fire water tank quantity calculation
Pump room civil works affecting firefighting BOQ
Fire pumps, jockey pumps, and accessories quantity basics
MODULE 4: External Firefighting System BOQ
4-External-Firefighting-System-BOQ
Yard hydrant pipelines and trench quantities
External hydrants, valves, and chamber measurements
Road cutting, backfilling, and restoration quantities
MODULE 5: Internal Hydrant System BOQ
5-Internal-Hydrant-System-BOQ
Riser pipes and horizontal distribution measurement
Landing valves, hose reels, and hose cabinets quantities
Supports, clamps, and embedded items in civil works
MODULE 6: Sprinkler System BOQ Preparation
6-Sprinkler-System-BOQ-Preparation
Sprinkler piping layout and diameter-wise quantities
Sprinkler heads, flexible drops, and fittings measurement
Zone control valves, flow switches, and test assemblies
MODULE 7: Fire Detection and Alarm Interface Quantities
7-Fire-Detection-and-Alarm-Interface-Quantities
Detector mounting requirements affecting civil coordination
Manual call points, hooters, and interface items
Cable tray openings and sleeves related to firefighting works
MODULE 8: Valves, Accessories, and Special Items
8-Valves-Accessories-and-Special-Items-in-Firefighting-BOQ
Butterfly valves, NRVs, pressure gauges, and strainers
Air release valves, drain valves, and test lines
Painting, identification, and system tagging quantities
MODULE 9: Testing, Commissioning, and Trial Run BOQ
9-Testing-Commissioning-and-Trial-Run-BOQ
Hydrostatic testing and flushing quantity considerations
Pump testing, flow testing, and system charging
Temporary arrangements and consumables during testing
MODULE 10: Final BOQ Compilation and Tender Presentation
10-Final-BOQ-Compilation-and-Tender-Presentation-for-Firefighting-Works
BOQ format structuring for firefighting works
Item description writing and unit selection
Cross-checking quantities with drawings and site conditions
Preview - FIREFIGHTING BOQ PREPARATION GUIDE FOR MEP ENGINEERS & CIVIL ENGINEERS
Discuss (
0
)
navigate_before
Previous
Next
navigate_next