arrow_back
Module 1: Fundamentals of BOQ in Infrastructure Projects
1-Mastering-BOQ-in-Infrastructure-Projects
Purpose & Components of BOQ
Standards & Measurement Codes
BOQ in Project Lifecycle
Units & Conversion Practices
Module 2: Site Investigation & Data Collection
2-Site-Investigation-and-Data-Collection-for-Road-and-Bridge-Projects
Topographic Survey for Roads/Bridges
Soil Investigation & Classification
Alignment & Setting-Out Data
Data Management & Reporting
Module 3: Measurement Principles & Practices
3-Measurement-Principles-and-Practices-for-Civil-Engineering
Linear & Area Measurement
Volume Calculation (Cross-Sections)
Allowances: Wastage, Lead & Lift
Sketches & Measurement Tables
Module 4: Earthwork Estimation for Roads
4-Earthwork-Estimation-for-Roads
Cut & Fill Quantities (Prismoidal)
Borrow Area & Disposal Calculation
Over-break & Trimming Allowances
Earthwork Scheduling & Tabulation
Module 5: Subgrade & Sub-base Works
5-Subgrade-and-Sub-base-Works-Foundation-for-Durable-Pavements
Subgrade Preparation & Compaction
Granular Sub-base Quantity
Geotextile & Stabilization Works
QA/QC Procedures
Module 6: Flexible Pavement Layers
6-Flexible-Pavement-Layers-Prime-and-Tack-Coat-Quantities
Prime & Tack Coat Quantities
Bituminous Macadam & Seal Coat
Dense Bituminous Macadam (DBM)
Quality Control of Bituminous Works
Module 7: Rigid Pavement (Concrete) Works
7-Rigid-Pavement-Concrete-Works
PCC Pavement Thickness & Qty
Dowel & Tie Bar Estimation
Curing & Joint Sealant
Formwork & Shuttering
Module 8: Drainage & Retaining Structures
8-Drainage-and-Retaining-Structures-Quantity-Estimation
Culvert Box & Pipe Quantities
Side Drain Excavation & Lining
Retaining Wall & Gabion Works
Measurement & BOQ Items
Module 9: Bridge Substructure Estimation
9-Bridge-Substructure-Estimation_
Pile Foundation Works
PCC & Reinforced Footing
Pier & Abutment Concrete Works
Backfill & Approach Slabs
Module 10: Bridge Superstructure & Finishes
10-Bridge-Superstructure-and-Finishes-Comprehensive-Guide
RCC Deck Slab & Reinforcement
Pre-stressed/Steel Girder Estimation
Bearings & Expansion Joints
Surface Finishes & Waterproofing
Module 11: Utilities & Ancillary Road Works
11-Utilities-and-Ancillary-Road-Works
Water Supply & Drainage Utilities
Electrical & Communication Ducts
Traffic Signs & Road Furniture
Safety Barriers & Fencing
Module 12: Rate Analysis & Pricing
12-Rate-Analysis-and-Pricing-in-Construction
Labour, Material & Equipment norms
Market Rate Collection
Overheads, Profit & Contingencies
Sample Rate Analysis Template
Module 13: BOQ Preparation & Documentation
13-BOQ-Preparation-and-Documentation
BOQ Format & Numbering
Road Works BOQ Template
Bridge Works BOQ Template
Cross-Checking & Validation
Module 14: Case Studies, Common Errors & Best Practices
14-Case-Studies-Common-Errors-and-Best-Practices-in-Civil-Engineering-Projects
Road Project Case Study
Bridge Project Case Study
Common Measurement & Pricing Errors
Best Practices & Lessons Learned
Preview - BOQ PREPARATION DETAILED GUIDE COURSE FOR CIVIL ENGINEERS AND CONSTRUCTION PROFESSIONALS OF ROADS, HIGHWAYS AND BRIDGES
Discuss (
0
)
navigate_before
Previous
Next
navigate_next