1. INTRODUCTION , MEANING OF TENDER, TENDERING , AND WHAT IS TENDERING PROCESS TO BE FOLLOWED BY CONTRACTORS
2. CONCEPTS OF NIT IN TENDER AND TENDER REVIEW REPORTS (BASICS) TRR MAKING
1.NIT
TRR OF BARAUNI THERMAL PLANT AND MIT SUMMARY MAKING FORMAT FOR THE PURPOSE OF BID APPROVAL BY OWNER
TRR OF BARAUNI THERMAL PLANT AND NIT SUMMARY SHEET
RISK ANALSYSIS THROUGH SITE INVESTIGATION PROCESS ~ 2. TENDER PROCESS OF ANALYSING RISKS BEFORE TAKING THE TENDER ~ WITH PRE TENDER SITE SURVEY REPORT USING
BHADANIS Site Survey Report Sheet(Allahbad)
4. PRELIMINIARY RATES MAKING FOR THE TENDER ~ PRICING TIPS AND TRICKS WITH EASY EXPLANATION ~ FACTORS TO BE CONSIDERED WHILE MAKING PRICE OF THE TENDER
Preliminary Costing RAtes
Township BOQ with corrigendum for practice to make and fill with DSR Rates
5. PRE BID MEETING ( CLARIFICATION WITH CLIENTS , MAJOR POINTS COVERED USING EXCEL SHEETS)
6. EMD EARNEST MONEY DEPOSIT EXPLANATION WITH PROPER EXAMPLES AND WHAT IS THE ROLE OF BANK GUARATEE AS A TOOL OF THE CONSTRUCTION PROJECT TO CARRY
7. UNDERSTANDING TENDER DOCUMENTS ~ WHAT ARE THE DOCUMENTS INCLUDED FOR MAKING TENDER DOCUMENTS ~ GO THROUGH EVERY ASPECTS IN A VERY DETAILED MANNER
TENDER DOCUMENTS FOR PRACTICE READING
1.NIT
2.Pre-Qualifying requirements
3. PROCEDURE-SEALED TENDER
4. PROJECT-INFORMATION
5. HSE-SPECIFICATION
6. General conditions of contract for civil works
7.Annexure to GCC
8. Scope and specific technical requirement
9.Customers Specifications for Civil Works
10. BOQ of Quantity (Annexure-I to VII )pdf
11.Price schedule Format-Annexure A
12.Summry of Total Price(Annexure-VIII)
13.E Pay format
15.Declaration for relation in BHEL
TECHNICAL CONDITION OF CONTRACT
EPI CONTRACTS DOCUMENTS
14.85ATTACHMENT 1
14.85ATTACHMENT 2
14.85ATTACHMENT 3
14.85ATTACHMENT 4
8. TENDER SEARCHING AND MAKING A DETAILED ANALYSIS REPORT SUMMARY AND TYPES OF TENDERS IN ALL PARTS OF THE WORLD
9. TECHNICAL BID PREPARATION AND HOW TO MAKE WITH THE ENVELOPE SYSTEM AND WHAT DOCUMENTS NEED TO BE PREPARED AND FORMATS USED IN EXCEL
10. FINANCIAL BID PREPRATION ~ TIPS AND TRICKS
11. CLIENT BID EVALUATION STRATEGY ~ AND HOW THE CLIENT CHECKS THE SUBMITTED TENDER ~ REJECTS AND ACCEPTS THE TENDER WITH REVERSE AUCTION STRATEGY EXPLANATION
12. DEALING WITH NEGOTIATION WITH THE CLIENT AFTER GETTING SELECTED AS A CONTRACTOR EFFECTIVELY
Tender-Evaluation Format
13. TENDER EVALUATION USING EXCEL AND INTRODUCTION TO CONTRACT AND AGREEMENT
14. STRATEGY TO MAKE CONTRACTS AND STRATEGY TO TRANSFER RISK TO THE CONTRACTOR
PUBLIC PRIVATE PARTNERSHIP CONTRACT STRATEGY
15. UNDERSTANDING CONSTRUCTION CONTRACTS IN A DETAILED MANNER - TYPES
UNDERSTANDING CLAIMS AND HOW TO GET IT WITH PRACTICAL IMPLEMENTATION
16. DELAY CLAIMS INTRODUCTION AND EXPLANATION
16. Delays-in-project NOTES DOWNLOAD
17. CLAIMS ~ FINDING HEAD OFFICE EXPENSES WITH THE FORMULAES MAKE BY BHADANIS INSTITUTE
18. PREPARATION AND SUBMISSION OF CLAIMS WITH PROPER UNDERSTANDING OF EACH AND EVERY ASPECTS IN A VERY DETAILED MANNER
19. UNDERSTANDING EPC CONTRACT WITH ALL RELATED PROBLEMS, RISKS WITH THE SOLUTIONS