1. INTRODUCTION , MEANING OF TENDER, TENDERING , AND WHAT IS TENDERING PROCESS TO BE FOLLOWED BY CONTRACTORS
lock
2. CONCEPTS OF NIT IN TENDER AND TENDER REVIEW REPORTS (BASICS) TRR MAKING
lock
1.NIT
lock
TRR OF BARAUNI THERMAL PLANT AND MIT SUMMARY MAKING FORMAT FOR THE PURPOSE OF BID APPROVAL BY OWNER
lock
TRR OF BARAUNI THERMAL PLANT AND NIT SUMMARY SHEET
lock
RISK ANALSYSIS THROUGH SITE INVESTIGATION PROCESS ~ 2. TENDER PROCESS OF ANALYSING RISKS BEFORE TAKING THE TENDER ~ WITH PRE TENDER SITE SURVEY REPORT USING
lock
BHADANIS Site Survey Report Sheet(Allahbad)
lock
4. PRELIMINIARY RATES MAKING FOR THE TENDER ~ PRICING TIPS AND TRICKS WITH EASY EXPLANATION ~ FACTORS TO BE CONSIDERED WHILE MAKING PRICE OF THE TENDER
lock
Preliminary Costing RAtes
lock
Township BOQ with corrigendum for practice to make and fill with DSR Rates
lock
5. PRE BID MEETING ( CLARIFICATION WITH CLIENTS , MAJOR POINTS COVERED USING EXCEL SHEETS)
lock
6. EMD EARNEST MONEY DEPOSIT EXPLANATION WITH PROPER EXAMPLES AND WHAT IS THE ROLE OF BANK GUARATEE AS A TOOL OF THE CONSTRUCTION PROJECT TO CARRY
lock
7. UNDERSTANDING TENDER DOCUMENTS ~ WHAT ARE THE DOCUMENTS INCLUDED FOR MAKING TENDER DOCUMENTS ~ GO THROUGH EVERY ASPECTS IN A VERY DETAILED MANNER
lock
TENDER DOCUMENTS FOR PRACTICE READING
lock
1.NIT
lock
2.Pre-Qualifying requirements
lock
3. PROCEDURE-SEALED TENDER
lock
4. PROJECT-INFORMATION
lock
5. HSE-SPECIFICATION
lock
6. General conditions of contract for civil works
lock
7.Annexure to GCC
lock
8. Scope and specific technical requirement
lock
9.Customers Specifications for Civil Works
lock
10. BOQ of Quantity (Annexure-I to VII )pdf
lock
11.Price schedule Format-Annexure A
lock
12.Summry of Total Price(Annexure-VIII)
lock
13.E Pay format
lock
15.Declaration for relation in BHEL
lock
TECHNICAL CONDITION OF CONTRACT
lock
EPI CONTRACTS DOCUMENTS
lock
14.85ATTACHMENT 1
lock
14.85ATTACHMENT 2
lock
14.85ATTACHMENT 3
lock
14.85ATTACHMENT 4
lock
8. TENDER SEARCHING AND MAKING A DETAILED ANALYSIS REPORT SUMMARY AND TYPES OF TENDERS IN ALL PARTS OF THE WORLD
lock
9. TECHNICAL BID PREPARATION AND HOW TO MAKE WITH THE ENVELOPE SYSTEM AND WHAT DOCUMENTS NEED TO BE PREPARED AND FORMATS USED IN EXCEL
lock
10. FINANCIAL BID PREPRATION ~ TIPS AND TRICKS
lock
11. CLIENT BID EVALUATION STRATEGY ~ AND HOW THE CLIENT CHECKS THE SUBMITTED TENDER ~ REJECTS AND ACCEPTS THE TENDER WITH REVERSE AUCTION STRATEGY EXPLANATION
lock
12. DEALING WITH NEGOTIATION WITH THE CLIENT AFTER GETTING SELECTED AS A CONTRACTOR EFFECTIVELY
lock
Tender-Evaluation Format
lock
13. TENDER EVALUATION USING EXCEL AND INTRODUCTION TO CONTRACT AND AGREEMENT
lock
14. STRATEGY TO MAKE CONTRACTS AND STRATEGY TO TRANSFER RISK TO THE CONTRACTOR
lock
PUBLIC PRIVATE PARTNERSHIP CONTRACT STRATEGY
lock
15. UNDERSTANDING CONSTRUCTION CONTRACTS IN A DETAILED MANNER - TYPES
lock
UNDERSTANDING CLAIMS AND HOW TO GET IT WITH PRACTICAL IMPLEMENTATION
lock
16. DELAY CLAIMS INTRODUCTION AND EXPLANATION
lock
16. Delays-in-project NOTES DOWNLOAD
lock
17. CLAIMS ~ FINDING HEAD OFFICE EXPENSES WITH THE FORMULAES MAKE BY BHADANIS INSTITUTE
lock
18. PREPARATION AND SUBMISSION OF CLAIMS WITH PROPER UNDERSTANDING OF EACH AND EVERY ASPECTS IN A VERY DETAILED MANNER
lock
19. UNDERSTANDING EPC CONTRACT WITH ALL RELATED PROBLEMS, RISKS WITH THE SOLUTIONS