arrow_back
Module 1 – Project Initiation & Scope Definition
1-Interior-Fitout-Project-Planning-and-Management
1.1 Defining Client Requirements and Objectives
1.2 Translating Business Needs into Fit-out Scope
1.3 Conducting Site Surveys and As-Built Documentation
Module 2 – Design Coordination & Documentation
2-Design-Coordination-and-Documentation
2.1 Integrating Architectural, MEP and FF&E Inputs
2.2 Preparing Detailed Layouts and Finish Schedules
2.3 Managing Revisions and Version Control
Module 3 – Procurement Strategy & Sourcing
3-Procurement-Strategy-and-Sourcing-for-Commercial-Fitout-Works
3.1 Selecting Suppliers for Finishes and Fixtures
3.2 Lead-time Analysis and Delivery Planning
3.3 Tendering, Negotiation and Purchase Orders
Module 4 – Cost Estimation & Budget Control
4-Cost-Estimation-and-Budget-Control-for-Commercial-Fitout-Interior-Works
4.1 Bill of Quantities for Interior Elements
4.2 Cost Breakdown Structure and Contingency Planning
4.3 Tracking Variations and Reforecasting
Module 5 – Work Breakdown Structure & Task Definition
5-Work-Breakdown-Structure-and-Task-Definition
5.1 Decomposing Fit-out into Work Packages
5.2 Sequencing Tasks for Logical Flow
5.3 Identifying Long-Lead and Critical Activities
Module 6 – Master Scheduling & Time Management
6-Master-Scheduling-and-Time-Management-for-Interior-Fitout-Projects
6.1 Building the Overall Project Gantt Chart
6.2 Critical Path Analysis and Float Management
6.3 Milestones, Handover Dates and Early Warning Indicators
Module 7 – Resource Planning & Allocation
7-Resource-Planning-and-Allocation-for-Interior-Fitout-Projects
7.1 Labour Profiling and Crew Deployment
7.2 Equipment and Tooling Logistics
7.3 Balancing Peak Demands and Idle Time
Module 8 – Logistics & On-Site Material Management
8-Logistics-and-On-Site-Material-Management
8.1 Storage, Handling and Protection of Finishes
8.2 Just-in-Time Deliveries vs. Bulk Staging
8.3 Waste Segregation and Returnable Packaging
Module 9 – Quality Assurance & Control
9-Quality-Assurance-and-Control-for-Interior-Fitout-Projects
9.1 Defining Acceptance Criteria for Finishes
9.2 Inspection Checklists and Hold Points
9.3 Non-conformance Reporting and Corrective Actions
Module 10 – Health, Safety & Environment Management
10-Health-Safety-and-Environment-Management
10.1 Site Inductions, PPE and Hazard Awareness
10.2 Safe Work Method Statements for Fit-out Trades
10.3 Environmental Controls and Indoor Air Quality
Module 11 – Contract Administration & Change Management
11-Contract-Administration-and-Change-Management
11.1 Roles and Responsibilities under the Contract
11.2 Processing Change Requests and Valuation
11.3 Claims Avoidance and Extension of Time
Module 12 – Communication & Stakeholder Management
12-Communication-and-Stakeholder-Management-for-Interior-Fitout-Projects
12.1 Establishing Regular Progress Meetings
12.2 Reporting Formats: Daily Logs, Weekly Reports
12.3 Managing Client, Designer and Subcontractor Interfaces
Module 13 – Site Coordination & Progress Monitoring
13-Site-Coordination-and-Progress-Monitoring
13.1 Daily Resource Deployment and Task Tracking
13.2 Site Walk-downs and Photographic Records
13.3 Updating Schedule and Re-planning as Needed
Module 14 – Risk Management & Issue Resolution
14-Unlocking-Project-Success-Strategic-Risk-Mitigation-and-Seamless-Issue-Resolution-in-Interior-Fit
14.1 Identifying and Assessing Fit-out-Specific Risks
14.2 Mitigation Plans and Risk Owners
14.3 Issue Logs, Escalation Paths and Lessons Learned
Module 15 – Handover, Commissioning & Project Closeout
15-Handover-Commissioning-and-Project-Closeout
15.1 Final Inspections, Snagging and Punch Lists
15.2 Client Training on Systems and Maintenance
15.3 Documentation Handover and Closeout Report
Preview - Construction Projects Planning , Scheduling & Management For Interior Fitout Works For Commercial & Retail Building Online Course
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US !