arrow_back
MODULE 1: Introduction to Urban Infrastructure Projects
1-Urban-Infrastructure-Estimation-and-BOQ-Preparation
Overview of Urban Infrastructure Components (roads, drainage, water, sewerage, power, telecom, etc.)
Types of Urban Development Projects (greenfield, brownfield, retrofitting, renewal)
Key Stakeholders and Implementation Agencies (ULBs, Smart City Mission, PMAY, AMRUT)
Project Lifecycle and Documentation Requirements
MODULE 2: Fundamentals of Estimation and BOQ Preparation
2-Fundamentals-of-Estimation-and-BOQ-Preparation
Importance of Quantity Estimation and BOQ in Urban Projects
Types of Estimates: Preliminary, Detailed, Abstract, and Revised
Components of a BOQ – Item Description, Quantity, Unit, Rate, Amount
Standard Methods of Measurement and Description (CPWD & MoUD Guidelines)
MODULE 3: Surveying and Data Collection for Estimation
3-Surveying-and-Data-Collection-for-Estimation
Site Survey and Mapping Requirements
Utility and Service Line Identification
Cross Sections, Longitudinal Sections, and Level Sheets
Data Interpretation for Quantification and Cost Planning
MODULE 4: Estimation of Urban Roads and Pavements
4-Estimation-of-Urban-Roads-and-Pavements
Earthwork, Subgrade, and Granular Sub-Base Calculation
Bituminous and Concrete Pavement Quantities
Curbstone, Median, Footpath, and Paver Works
Rate Analysis and BOQ Preparation for Road Components
MODULE 5: Estimation for Urban Water Supply Networks
5-Estimation-for-Urban-Water-Supply-Networks
Pipeline Materials and Laying Methods (DI, HDPE, GI, PVC)
Valve Chambers, Thrust Blocks, and House Connections
Excavation, Bedding, and Backfilling Quantities
BOQ Preparation and Cost Breakdown for Water Supply Works
MODULE 6: Estimation for Sewerage and Drainage Systems
6-Estimation-for-Sewerage-and-Drainage-Systems
Sewer Line Laying and Manhole Estimation
Stormwater Drain (RCC, Brick, Precast) Quantity Computation
Pumping Station and Chamber Works
Rate Analysis and BOQ Preparation for Sewerage and Drainage Items
MODULE 7: Estimation of Urban Electrical and Street Lighting Works
7-Urban-Electrical-and-Street-Lighting-Works-Estimation
Ducting and Cable Trench Quantities
Street Light Pole Foundation and Erection
Cabling, Earthing, and Junction Box Estimation
BOQ and Rate Analysis for Urban Electrical Infrastructure
MODULE 8: Estimation for Urban Landscape and Streetscape Projects
8-Estimation-for-Urban-Landscape-and-Streetscape-Projects
Soft Landscape Quantities (Grass, Shrubs, Trees, Topsoil)
Hard Landscape Components (Benches, Bollards, Paving, Planters)
Irrigation and Water Feature Quantities
BOQ Compilation for Streetscape and Landscape Works
MODULE 9: Estimation for Urban Stormwater Management & Rainwater Harvesting
9-Estimation-for-Urban-Stormwater-Management-and-Rainwater-Harvesting
Catch Pits, Inlets, and Recharge Wells Quantities
Stormwater Conveyance Network Quantities
Storage Tanks, Sumps, and Pump Chambers
Rate Analysis and BOQ for Rainwater Harvesting Systems
MODULE 10: Estimation for Urban Solid Waste Management Infrastructure
10-Estimation-for-Urban-Solid-Waste-Management-Infrastructure
Collection Centers, Transfer Stations, and Segregation Units
Civil Works for Waste Bins, Platforms, and Sheds
Composting and Treatment Plant Estimation
BOQ Preparation and Cost Summarization for Solid Waste Facilities
MODULE 11: Estimation for Urban Transport & Flyover Projects
11-Estimation-for-Urban-Transport-and-Flyover-Projects
Earthwork, Retaining Walls, and Embankments
Bridge Decks, Pier, and Abutment Quantities
Structural Concrete, Reinforcement, and Formwork Estimation
BOQ and Abstract Cost for Flyovers and Elevated Corridors
MODULE 12: Estimation for Urban Building and Public Facility Works
12-Estimation-for-Urban-Building-and-Public-Facility-Works
Estimation of Civic Structures (Public Toilets, Shelters, Bus Stands)
RCC and Masonry Quantity Computation
Finishes, Fixtures, and Service Quantities
Preparation of BOQ and Abstract Cost for Building Components
MODULE 13: Rate Analysis and Cost Index for Urban Projects
13-Rate-Analysis-and-Cost-Index-for-Urban-Projects
Purpose and Method of Rate Analysis in Estimation
Material, Labour, Equipment, and Overhead Calculations
Using DSR/State SOR for Urban Infrastructure Items
Cost Index Adjustment and Escalation Factors
MODULE 14: BOQ Preparation, Verification, and Documentation
14-BOQ-Preparation-Verification-and-Documentation
Item Numbering, Grouping, and Formatting of BOQ
Abstract Cost Sheet and Cost Summary Preparation
Checking and Cross-Verification of Quantities
Documentation, Submission, and Certification of BOQ
MODULE 15: Case Studies and Practical Applications
15-Case-Studies-and-Practical-Applications
BOQ Preparation for Smart City Urban Road Redevelopment
Sewerage and Water Supply Estimation for Urban Expansion Zone
Mixed-Use Urban Infrastructure (Road, Drain, Electric, Water)
Lessons Learned and Common Errors in BOQ Preparation
Preview - Urban Infrastructure Estimation and BOQ Preparation – Professional Certification
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!