arrow_back
Module 1: Introduction to SMM KSA and Its Application
1-Saudi-Arabia-Standard-Method-of-Measurement-SMM-KSA_pdf
1.1 Purpose and Importance of SMM in Saudi Projects
1.2 Role of SMM KSA in BOQ and Cost Estimation
1.3 Key Differences Between SMM KSA, CESMM, and POMI
Module 2: General Principles and Definitions
2-Saudi-Arabia-Standard-Method-of-Measurement
2.1 Basic Terminologies Used in Measurement
2.2 Units of Measurement and Conventions in KSA
2.3 Rules of Deduction and Inclusion
Module 3: Measurement Procedure and Documentation
3-Measurement-Procedure-and-Documentation
3.1 Standard Measurement Formats and Documentation
3.2 Quantity Abstract Sheets and Work Breakdown Structure
3.3 Typical Errors and Good Practices in Measurement
Module 4: Site Preparation and Earthworks
4-Site-Preparation-and-Earthworks
4.1 Classification of Soil and Rock in Saudi Projects
4.2 Measurement Rules for Excavation, Filling & Compaction
4.3 Measurement of Disposal, Backfilling, and Dewatering
Module 5: Concrete Works
5-Concrete-Works-SMM-KSA-Professional-Guidance
5.1 Measurement of Plain and Reinforced Concrete
5.2 Formwork and Centering Quantification Rules
5.3 Measurement of Concrete Accessories and Cast-in Items
Module 6: Masonry and Block Works
6-Masonry-and-Block-Works
6.1 Classification of Masonry Works in SMM KSA
6.2 Measurement of Brick, Block, and Stone Masonry
6.3 Mortar Joints, Scaffolding, and Reinforcement Measurement
Module 7: Structural Steel and Metal Works
7-Structural-Steel-and-Metal-Works
7.1 Measurement of Structural Steel Components
7.2 Connection Details, Bolts, and Welding Quantification
7.3 Painting, Coating, and Erection Measurement
Module 8: Finishing Works (Plastering, Painting, Tiling)
8-Finishing-Works-Under-SMM-KSA
8.1 Measurement of Plastering, Rendering, and Gypsum Finishes
8.2 Painting and Decorative Works as per SMM KSA
8.3 Floor, Wall, and Ceiling Tiling Measurement
Module 9: Roofing and Waterproofing Works
9-Roofing-and-Waterproofing-Works
9.1 Measurement of Roof Finishes and Insulation Layers
9.2 Waterproof Membranes and Flashings
9.3 Gutters, Rainwater Pipes, and Associated Works
Module 10: Carpentry and Joinery Works
10-Carpentry-and-Joinery-Works
10.1 Timber Doors, Windows, and Frames Measurement
10.2 Cupboards, Wardrobes, and Fixed Furniture
10.3 Hardware, Finishes, and Installation Rules
Module 11: Metal Doors, Windows & Glazing
11-Metal-Doors-Windows-and-Glazing
11.1 Aluminum and Steel Frames Measurement
11.2 Glazing, Sealants, and Accessories
11.3 Fire-Rated Metal Works and Fixings
Module 12: Mechanical and Electrical Works (Basic Overview)
12.1 MEP Components in SMM KSA
12.2 Measurement Rules for Pipework and Ducting
12.3 Cable Trays, Conduits, and Fixtures
Module 13: Roadworks and Pavement Measurement
13.1 Measurement of Subgrade, Subbase, and Base Course
13.2 Asphalt and Concrete Pavements
13.3 Road Furniture, Markings, and Ancillaries
Module 14: Drainage, Sewerage, and Water Supply Works
14.1 Measurement of Manholes, Pipes, and Chambers
14.2 Excavation, Bedding, and Backfill Rules
14.3 Surface Drainage and Water Supply Network Measurement
Module 15: External and Landscaping Works
15.1 Measurement of Hard Landscaping – Kerbs, Pavers, and Walkways
15.2 Soft Landscaping – Turfing, Planting, and Irrigation
15.3 Boundary Walls, Fencing, and Gates Measurement
Module 16: Piling and Foundation Works
16.1 Measurement of Bored, Driven, and CFA Piles
16.2 Pile Caps, Raft Foundations, and Blinding
16.3 Reinforcement, Casing, and Testing Works
Module 17: Precast and Prefabricated Works
17.1 Measurement of Precast Concrete Components
17.2 Installation, Jointing, and Grouting
17.3 Measurement of Transportation and Erection
Module 18: Measurement for Demolition and Alteration Works
18.1 Classification and Measurement of Demolition Items
18.2 Measurement of Alteration, Repairs, and Refurbishment
18.3 Salvage, Reuse, and Disposal Quantification
Module 19: Preparation of Bill of Quantities (BOQ) as per SMM KSA
19.1 Structuring BOQ Format Based on SMM Sections
19.2 Writing Accurate Descriptions and Itemization
19.3 Linking BOQ with Specifications and Drawings
Module 20: Practical Application and Case Studies
20-Practical-Application-and-Case-Studies-KSA
20.1 Step-by-Step BOQ Preparation for a Sample Project
20.2 Comparison of SMM KSA Measurement with Actual Site Quantities
20.3 Common Mistakes and Audit Observations in Saudi Projects
Preview - Saudi Arabia Standard Method of Measurement (SMM KSA) – Professional Certification for Quantity Surveyors & Civil Engineers
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!