arrow_back
RCC-Bridge-Construction-Projects-Billing-Engineering Course Introduction
1. RA Bill Preparation for Bridge Projects
1-Bridge-Project-RA-Bill-Preparation-Guide
Excel Template: Customizable RA bill format with automated quantity x rate calculations, deductions for materials, and GST slabs.
Example: Sample RA bill for a 500m bridge with itemized pile foundations, abutments, and deck slab quantities.
Case Study: Resolving a 15% quantity mismatch between contractor records and client measurements for pier caps.
2. GST-Compliant Billing for Bridge Materials
2-GST-Compliant-Billing-for-Bridge-Materials
Explanation GST Compliant Billing
Excel Template: Invoice format with GST 18% (cement, steel) and 5% (concrete) breakdowns, including ITC claims.
Example: GST reconciliation for 1,200 MT of steel procured from 3 suppliers.
Case Study: Rectifying ITC mismatches due to supplier GSTIN errors in a multi-state bridge project.
3. Interim Payment Certification (IPC)
3-Interim-Payment-Certification-in-Bridge-Construction
Explanation of IPC
Excel Template: IPC checklist with client approval columns, measurement sheets, and statutory deduction formulas.
Example: IPC for Phase 1 (substructure) of a river bridge with 75% payment release.
Case Study: Re-submitting a rejected IPC due to missing test certificates for M35 concrete.
4. Material Reconciliation in Bridge Construction
4-Material-Reconciliation-in-Bridge-Construction
Explanation of MR in Bridge
Excel Template: Reconciliation tracker comparing billed vs. actual cement, steel, and aggregate consumption.
Example: Identifying a 12% steel surplus in pile foundations due to design optimization.
Case Study: Resolving a 200 MT cement shortage dispute with a third-party vendor.
5. Variation Claims and Extra Items
5-Variation-Claims-and-Extra-Items-in-Bridge-Construction
Explanation of Variation Claims
Excel Template: Variation order (VO) log with rate analysis columns for extra items like seismic retrofitting.
Example: Claiming additional rates for underwater pile casing not in the original BOQ.
Case Study: Negotiating a 22% rate hike for sudden rock excavation in pier foundations.
6. CPWD Billing Procedures for Bridges
Explanation of CPWD Billing Procedures
Excel Template: CPWD-style bill format with DSR codes, measurement units, and abstract sheets.
Example: Applying CPWD Schedule of Rates (2024) for reinforced concrete abutments.
Case Study: Delayed bill approval due to non-compliance with CPWD measurement rules for cantilever spans.
6-CPWD-Billing-Procedures-for-Bridges_pdf
7. ERP-Based Invoice Generation
7-ERP-Based-Invoice-Generation-in-Bridge-Construction
Explanation of ERP Billing
Excel Template: Simulated ERP interface for bridge project billing, including WO numbers and approval workflows.
Example: Generating a ₹8.5 crore invoice for pre-stressed girder installation.
Case Study: Correcting duplicate invoice entries in SAP caused by subcontractor data overlap.
8. Dispute Resolution in Bridge Billing
8-Dispute-Resolution-in-Bridge-Billing
Explanation of Dispute
Excel Template: Dispute log with columns for issue type (measurement/rates), resolution steps, and timelines.
Example: Arbitration process for a 9-month delay in span launching approvals.
Case Study: Settling a ₹1.2 crore penalty claim for alleged falsework design errors.
9. International Billing for Offshore Bridges
9-International-Billing-for-Offshore-Bridges
Explanation of International Billing
Excel Template: Proforma invoice in USD with INCOTERMS 2020 clauses and marine insurance columns.
Example: Currency hedging for a Maldives sea bridge using forward contracts.
Case Study: Managing LC payment delays for imported pre-stressing jacks from Germany.
10. Post-Construction Final Account Settlement
10-Post-Construction-Final-Account-Settlement-in-Bridge-Projects
Explanation of Post Construction Final Account Statement
Excel Template: Final account format with retention money (5%), defect liability deductions, and VAT adjustments.
Example: Closing accounts for a 2.5km viaduct project with 10-year maintenance clauses.
Case Study: Releasing retention after repairing 23 honeycombed piers during the defect period.
Preview - RCC BRIDGE CONSTRUCTION PROJECTS BILLING ENGINEERING COURSE
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US !
📚 Ebooks
🎥 Video Training