arrow_back
Static Load Testing
1-Static-Load-Testing-in-Geotechnical-Engineering
1.1. Reaction System Setup
1.2. Load Application Mechanisms
1.3. Settlement Measurement Devices
Quality and Test Reports Static Load Testing
Dynamic Load Testing
2-Dynamic-Load-Testing-in-Geotechnical-Engineering
2.1. Pile Driving Analyzer (PDA) Equipment
2.2. Strain Gauges and Accelerometers
2.3. Signal Matching Analysis System
QTR
Rapid Load Testing
3-Rapid-Load-Testing-in-Geotechnical-Engineering
3.1. Statnamic Device
3.2. Reaction Mass and Fuel Chamber
3.3. Laser Displacement Sensors
Quality & Test Reports
Bi-Directional Load Testing
4-Bi-Directional-Load-Testing-in-Foundation-Engineering
4.1. Osterberg Cell Installation
4.2. Hydraulic Supply System
4.3. Telltale Instrumentation
Quality & Test Reports
Lateral Load Testing
5-Lateral-Load-Testing-in-Geotechnical-Engineering
5.1. Hydraulic Jack and Pump Setup
5.2. Reaction Pile or Anchor System
5.3. Inclinometer and Deflection Measurement
Quality & Test Reports
Integrity Testing
6.1. Pile Integrity Tester (PIT)
6.2. Accelerometer and Hammer
6.3. Signal Processing Unit
Quality & Test Reports
Cross-Hole Sonic Logging
7-Cross-Hole-Sonic-Logging-Understanding-Foundation-Quality-Through-Sound
7.1. Ultrasonic Probes
7.2. Depth Encoder System
7.3. Data Acquisition Unit
Quality & Test Reports
Thermal Integrity Profiling
8-Thermal-Integrity-Profiling-for-Concrete-Piles
8.1. Thermal Probes or Wires
8.2. Readout Unit
8.3. Temperature Analysis Equipment
Quality & Test Reports
Pile Driving Monitoring
9-Pile-Driving-Monitoring-Keeping-Foundations-Safe
9.1. Pile Driving Analyzer (PDA)
9.2. Strain Transducers and Accelerometers
9.3. Data Recording and Analysis System
Quality & Test Reports
Tension Load Testing
10-Tension-Load-Testing-Understanding-Pile-Foundation-Strength
10.1. Hydraulic Jack and Load Cell
10.2. Anchor System or Reaction Frame
10.3. Displacement Transducers
Quality & Test Reports
Compression Load Testing
11-Pile-Load-Testing-Understanding-Compression-Load-Testing
11.1. Hydraulic Jack and Pressure Gauge
11.2. Reaction Beam and Kentledge
11.3. Dial Gauges and Reference Beam
Quality & Test Reports
Combined Load Testing
12-Pile-Load-Testing-Combined-Load-Testing-Methods
12.1. Multi-directional Loading Frame
12.2. Hydraulic Actuators
12.3. Load and Displacement Sensors
Quality & Test Reports
High-Strain Dynamic Testing
13-High-Strain-Dynamic-Testing-for-Pile-Foundations
13.1. Heavy Drop Weight System
13.2. Cushioning Materials
13.3. High-speed Data Acquisition System
Quality & Test Reports
Low-Strain Integrity Testing
14-Low-Strain-Integrity-Testing-for-Pile-Foundations
14.1. Handheld Hammer
14.2. Accelerometer or Geophone
14.3. Signal Amplifier and Recorder
Quality & Test Reports
Pile Drilling and Installation Monitoring
15-Pile-Drilling-and-Installation-Monitoring
15.1. Drilling Parameter Recorder
15.2. Inclinometer for Verticality Check
15.3. Concrete Volume Measurement System
Quality & Test Reports
Module 16: Pile Boring and Drilling Equipments
16-Pile-Boring-and-Drilling-Equipment
16.1. Rotary Drilling Rigs (Kelly bar, augers, and buckets)
16.2. Reverse Circulation Drilling (RC rigs and mud pumps)
16.3. Casing and Stabilization Systems (temporary/permanent casings, oscillator rigs)
Module 17: Concrete Placement Systems
17-Concrete-Placement-Systems-for-Pile-Construction
17.1. Tremie Pipe Method (pipe handling, joint checks, concrete flow)
17.2. Pumped Concrete Method (pressure monitoring, segregation checks)
17.3. Flow Monitoring and Slump Control (workability checks at site)
Module 18: Reinforcement Handling and Placement
18-Reinforcement-Handling-and-Placement-in-Pile-Construction
18.1. Cage Fabrication and Coupler Joints
18.2. Cage Lowering and Centralizers
18.3. Cage Alignment and Splicing in Deep Piles
Module 19: Drilling Fluid and Slurry Management
19-Drilling-Fluid-and-Slurry-Management
19.1. Bentonite Preparation Units (mixer, tank, circulation pumps)
19.2. Polymer Fluids in Drilling (advantages, monitoring parameters)
19.3. Slurry Testing and Disposal (density, viscosity, sand content)
Module 20: Pile Head Preparation and Chiseling
20-Pile-Head-Preparation-and-Chiselling
20.1. Pile Head Breaking Equipments (hydraulic breakers, chisels)
20.2. Safety Practices in Head Chiseling
20.3. Cleaning and Preparing Pile Top for Load Testing
Module 21: Instrumentation and Monitoring Equipments
21-Instrumentation-and-Monitoring-Equipment-for-Pile-Load-Testing
21.1. Load Cells and Pressure Transducers
21.2. Inclinometers and Settlement Markers
21.3. Data Loggers and Wireless Transmission Systems
Module 22: Safety and Risk Management in Pile Execution
22-Safety-and-Risk-Management-in-Pile-Execution
22.1. Equipment Safety (rigs, cranes, hydraulic jacks)
22.1. Equipment Safety (rigs, cranes, hydraulic jacks)
22.3. Emergency Procedures (collapse prevention, slurry spill response)
Module 23: Quality Control in Pile Execution
23-Quality-Control-in-Pile-Execution
23.1. Pile Integrity Checks During Construction
23.2. Concrete Quality and Sampling Procedures
23.3. Reinforcement Verification and Record-Keeping
Module 24: Reporting and Documentation Systems
24-Reporting-and-Documentation-Systems
24.1. Daily Drilling Logs and Boring Records
24.2. Concrete Pouring Records and Cube Test Reports
24.3. Final Pile Test Certificates and Consultant Submissions
Module 25: Case Studies and Failure Investigations
25-Case-Studies-and-Failure-Investigations-in-Pile-Load-Testing
25.1. Common Failures in Pile Load Testing (false readings, equipment malfunction)
25.2. Case Study – Metro Projects in India (Delhi, Mumbai, Chennai)
25.3. Case Study – Gulf Region Mega Piles (offshore platforms, tall towers)
Preview - PILE LOAD TESTING AND IT EXECUTION METHODS USING EQUIPMENTS ONLINE COURSE
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US !