arrow_back
MODULE 1: Nature of Data in G+45 High-Rise Projects
1-Data-Analytics-for-G45-High-Rise-Construction-Projects
1. Data Analytics for Skyscrapers_ How 1,200+ Daily Records Transform Construction Management
Why high-rise data behaves differently from low-rise projects
Volume, frequency, and repetition of site records
Identifying critical data points for tall structures
MODULE 2: Project Data Flow in High-Rise Construction
2-Project-Data-Flow-in-High-Rise-Construction
2. DATA ANALYTICS From Data to Skyscraper_ How Construction Sites Track Every Detail
How data moves from site to management
Role of site engineers in data generation
Breakdowns caused by poor data flow
MODULE 3: Data Discipline Across 45+ Floors
3-Data-Discipline-Across-45-Floors
3. Data Discipline in High-Rise Construction_ How to Track 45 Floors of Complex Building Records
Standardization of site records
Floor-wise consistency challenges
Accountability and ownership of records
MODULE 4: Daily Progress Data Analysis
4-Daily-Progress-Data-Analysis
4. Decoding Daily Progress Reports_ Spot Real vs. Fake Project Progress in Construction
Reading daily progress reports correctly
Identifying false progress signals
Converting daily numbers into usable trends
MODULE 5: Weekly and Monthly Performance Trends
5-Weekly-and-Monthly-Performance-Trends
5. Construction Project Trends_ How Weekly Data Reveals Your Site's Real Performance Secrets!
Aggregating daily site data
Detecting slowdowns and recoveries
Understanding trend direction versus snapshots
MODULE 6: Floor-Wise Progress Analytics
6-Floor-Wise-Progress-Analytics
6. Building Smarter_ How Construction Teams Track Floor-by-Floor Progress in Real Time
Floor-by-floor production comparison
Identifying weak and strong floors
Managing productivity variation vertically
MODULE 7: Core and Structural Cycle Data
7-Core-and-Structural-Cycle-Data
7. Building Skyscrapers_ The 7-Day Construction Cycle Explained with Simple Animations
Typical core cycle benchmarks
Structural activity sequencing data
Detecting cycle time creep
MODULE 8: Slab Cycle Time Analysis
8-Slab-Cycle-Time-Analysis
8. Slab Cycle Time Analysis_ How Construction Teams Optimize High-Rise Building Schedules in 10 Minutes
Planned versus actual slab cycles
Impact of repetition learning curves
Using slab data to improve future floors
MODULE 9: Manpower Deployment Data
9-Manpower-Deployment-Data-Analytics
9. Tracking Workers_ How Construction Teams Optimize Manpower in Skyscrapers
Trade-wise manpower tracking
Floor-wise labor distribution
Identifying manpower imbalance
MODULE 10: Productivity and Output Analysis
10-Productivity-and-Output-Analysis
10. Construction Productivity Secrets_ How Gangs Measure Their Work Performance
Output per gang and per trade
Productivity loss indicators
Comparing productivity across floors
MODULE 11: Vertical Material Movement Data
11-Vertical-Material-Movement-Data-Analytics
11. Vertical Movement Analytics_ Construction Efficiency Decoded
Hoist, crane, and lift usage records
Waiting time and congestion analysis
Impact on productivity and cycle time
MODULE 12: Material Consumption Patterns
12-Material-Consumption-Patterns-in-High-Rise-Construction
12. Material Consumption Tracking_ How Construction Projects Save Millions in 15 Minutes
Planned versus actual material usage
Floor-wise consumption comparison
Detecting abnormal usage early
MODULE 13: Concrete Production and Pour Data
13-Concrete-Production-and-Pour-Data-Management
13. Concrete Tracking_ How to Measure and Manage Construction Volumes Like a Pro
Pour-wise volume tracking
Delay, rejection, and re-pour analysis
Strength results and performance trends
MODULE 14: Rebar and Formwork Data
14-Rebar-and-Formwork-Data-Analytics
14. Rebar Movement Analytics_ How Construction Projects Track Material Flow in 5 Simple Steps
Quantity movement versus execution
Repetition efficiency tracking
Loss and recovery indicators
MODULE 15: Planning Schedule Data Interpretation
15-Planning-Schedule-Data-Interpretation
15. Project Schedule Decoding_ Predict Construction Delays Before They Happen!
Understanding logic behind schedules
Reading float consumption
Detecting hidden slippages
MODULE 16: Look-Ahead Planning Data
16-Look-Ahead-Planning-Data-Analytics
16. Construction Planning Secrets_ How to Predict and Track Project Success in 4 Weeks
Short-term planning accuracy checks
Commitment versus achievement analysis
Improving reliability of look-ahead plans
MODULE 17: Cost Data for High-Rise Execution
17-Cost-Data-for-High-Rise-Execution
17. High-Rise Construction Cost Tracking_ Floor by Floor Breakdown for Project Managers
Floor-wise cost accumulation
Activity-wise cost comparison
Early signs of cost overruns
MODULE 18: Quantity and Measurement Analytics
18-Quantity-and-Measurement-Analytics
18. Construction Measurement Analytics_ Track, Control, and Optimize Project Quantities
Measurement records as control tools
Missed, duplicated, and delayed quantities
Linking execution with measurements
MODULE 19: Billing Performance Analysis
19-Billing-Performance-Analysis
19. Construction Billing Cycles Decoded_ How Cash Flow Really Works in High-Rise Projects
Billing cycle duration analysis
Executed versus billed quantity gaps
Cash flow impact of billing delays
MODULE 20: Subcontractor Performance Data
20-Subcontractor-Performance-Data
20. Construction Project Management_ Tracking Subcontractor Performance Like a Pro
Output, delay, and quality tracking
Payment versus performance correlation
Risk identification using past data
MODULE 21: Finishing Works Data Analysis
21-Finishing-Works-Data-Analysis
21. Construction Finishing Works_ Decoding Trade Overlap and Productivity Data
Trade overlap and congestion data
Floor-wise finishing productivity
Rework and delay pattern detection
MODULE 22: Quality Control Data Interpretation
22-Quality-Control-Data-Interpretation
Inspection and non-conformance records
Rework frequency analysis
Cost and time impact of quality failures
MODULE 23: Safety Records and Risk Patterns
23-Safety-Records-and-Risk-Patterns
Incident and near-miss data
High-risk activity identification
Preventive action effectiveness review
MODULE 24: Delay Cause Identification
24-Delay-Cause-Identification-in-High-Rise-Construction-Projects
Resource-related delays
Approval and coordination delays
Weather and external disruption patterns
MODULE 25: Delay Justification Using Data
25-Delay-Justification-Using-Data
Supporting claims with site records
Correlating delay causes with timelines
Avoiding weak or unsupported arguments
MODULE 26: Decision-Making Using Project Data
26-Decision-Making-Using-Project-Data
What senior managers should focus on
Avoiding decisions based on assumptions
Prioritizing actions using numbers
MODULE 27: Management Reporting for Tall Buildings
27-Management-Reporting-for-Tall-Buildings
What to highlight and what to hide
Presenting complex data simply
Common reporting mistakes in high-rise projects
MODULE 28: Early Warning Systems in G+45 Projects
28-Early-Warning-Systems-in-G45-Projects
Identifying danger signs before escalation
Using trend shifts as alerts
Preventive action planning
MODULE 29: Coordination Through Shared Data
29-Coordination-Through-Shared-Data
Aligning execution, planning, and billing
Reducing conflicts using common numbers
Improving inter-team trust
MODULE 30: Creating a Data-Driven High-Rise Site Culture
30-Management-Reporting-for-Tall-Buildings
Training teams to respect site records
Accountability through transparent data
Long-term benefits for large vertical projects
Preview - G+45 High-Rise Building Construction Project Data Analytics for Civil Engineers, Construction Professionals Online Course, IT Engineers
Discuss (
0
)
navigate_before
Previous
Next
navigate_next