Module 1: Introduction to Tamil Nadu PWD SOR and Estimation Fundamentals
Module 1 Tamil
Overview of Tamil Nadu PWD Schedule of Rates – Structure and Usage
Types of Estimation: Preliminary, Detailed, Revised, and Revised Abstract
Basic Principles of Estimation and Costing in Government Projects
Units of Measurement and Standard Codes Followed in Tamil Nadu PWD
Module 2: Understanding Work Orders, Drawings, and Tender Documents
Module 2 Tamil
Interpreting PWD Tender Documents and Drawings
Bill of Quantities (BOQ) Preparation as per Tamil Nadu PWD Format
Reading and Using Approved Standard Drawings for Estimation
Role of Technical Specifications and Special Conditions in Estimation
Module 3: Quantity Surveying Techniques for Civil Works
Module 3 Tamil
Linear and Cubic Measurement Techniques as per PWD Standards
Measurement of Earthwork: Excavation, Filling, and Compaction
Measurement of Concrete Works: PCC, RCC, and Precast Units
Measurement of Masonry and Brickworks
Module 4: Estimation of Earthwork and Road Works
Module 4 Tamil
Soil Classification and Lead & Lift Concepts in Earthwork Estimation
Embankment and Subgrade Preparation Estimation
Bituminous Road and Pavement Estimation as per Tamil Nadu PWD SOR
Estimation of Drainage and Side Structures in Road Projects
Module 5: Estimation of RCC and Structural Works
Module 5 Tamil
Reinforced Cement Concrete (RCC) Works Estimation Process
Formwork and Centering Measurement for RCC Structures
Estimation of Steel Reinforcement: Bar Bending Schedules (BBS)
Prestressed Concrete Elements and Their Estimation
Module 6: Estimation of Masonry and Brickwork
Module 6 Tamil
Brick Masonry in Cement Mortar and Lime Mortar
Stone Masonry and Rubble Masonry Estimation
Plastering and Pointing Works as per SOR Rates
Wall Finishes, Painting, and Waterproofing Costing
Module 7: Estimation of Flooring and Roofing Works
Module 7 Tamil
Flooring Types: Kota Stone, Granite, Mosaic, and Cement Concrete Flooring
Roof Slabs, Tiles, and Sheet Roofing Estimation
Waterproofing Treatments and Thermal Insulation Estimation
Estimation of Ceiling Works and False Ceilings
Module 8: Estimation of Sanitary and Plumbing Works
Module 8 Tamil
Sanitary Fixtures, Pipe Laying, and Sewerage Works
Storm Water Drainage and Rainwater Harvesting Systems
Water Supply and Pumping Arrangements Costing
Estimation of Sewage Treatment Plant and Effluent Disposal
Module 9: Electrical and Internal Services Estimation Basics
Module 9 Tamil
Estimation of Electrical Wiring and Fixtures as per PWD Standards
Internal Lighting, Power Points, and Earthing Systems
Costing for HVAC and Ventilation Systems in PWD Projects
Estimation of Fire Fighting and Safety Equipment
Module 10: Labour, Material, and Equipment Cost Analysis
Module 10 Tamil
Labour Wage Structures and Productivity Rates as per Tamil Nadu PWD
Material Costing with Market Rate Analysis and Allowances
Equipment Hiring Charges and Depreciation Calculation
Cost Indices and Rate Adjustment Factors in Government Works
Module 11: Preparation of Rate Analysis and Market Rate Justification
Module 11 Tamil
Components of Rate Analysis: Labour, Material, Tools, and Overheads
Preparation of Rate Analysis for Common Items as per Tamil Nadu PWD
Market Rate Collection and Documentation Process
Rate Analysis for Special Items and New Technologies
Module 12: Tender Preparation, Submission, and Contract Management
Module 12 Tamil
Compilation of Tender Documents and Cost Estimates
Understanding Tender Schedules, Earnest Money, and Security Deposit
Contract Types and Their Impact on Estimation and Cost Control
Role of PWD Schedule of Rates in Contract Bill Preparation
Module 13: Running Account Bill Preparation and Measurement Checks
Module 13 Tamil
Procedures for Measurement and Verification of Works on Site
Preparation of Running Account Bills as per Tamil Nadu PWD Format
Handling Variations, Extra Items, and Provisional Sums
Common Errors in Measurement and Billing and How to Avoid Them
Module 14: Cost Control and Project Monitoring Techniques
Module 14 Tamil
Budget Preparation and Cost Baseline Establishment
Techniques for Cost Monitoring and Variance Analysis
Impact of Delay and Variation Orders on Costing
Reporting and Documentation for Cost Control in PWD Projects
Module 15: Case Studies and Practical Exercises on Tamil Nadu PWD Projects
Module 15 Tamil
Estimation of a Residential Building Project Using Tamil Nadu PWD SOR
Costing and Rate Analysis for Road Rehabilitation Works
Running Account Bill Preparation for a Bridge Construction Project
Practical Exercise: Market Rate Survey and Rate Justification
Preview - Quantity Surveying & Estimation and Costing Course Based on Tamil Nadu PWD SOR