arrow_back
Module 1: Introduction to Electrical BOQ for High Rise Projects
1-Electrical-BOQ-Preparation-Guide-for-High-Rise-Buildings
Purpose and importance of Electrical BOQ in high rise buildings
BOQ format and standard structure
Key electrical systems in G+45 building and scope coverage
Module 2: Understanding Project Drawings and Specifications
2-Understanding-Project-Drawings-and-Specifications
Reading architectural and electrical layout drawings
Interpreting schedules (lighting, power, earthing, etc.)
Identifying scope from specifications and notes
Module 3: Cabling Systems and Conduits
3-Cabling-Systems-and-Conduits
Power and control cabling (types, sizes, routing)
Conduit and trunking systems
Quantification methods for cables and conduits
Module 4: Lighting System BOQ
4-Lighting-System-BOQ
Fixtures and fittings (internal & external)
Lighting controls and accessories
Estimating quantities and unit rates
Module 5: Power Distribution Board and Panel Schedules
5-Power-Distribution-Board-and-Panel-Schedules
Main and sub distribution boards
Panel schedules and breaker details
BOQ items for boards, breakers, and accessories
Module 6: Power Outlets and Receptacles
6-Power-Outlets-and-Receptacles
Types of outlets and location planning
Quantification of sockets and associated hardware
Rate analysis and inclusion in BOQ
Module 7: Earthing and Lightning Protection
7-Earthing-and-Lightning-Protection
Earthing system design basics
Lightning protection components
BOQ preparation for earthing and protection systems
Module 8: Fire Alarm and Safety Systems
8-Fire-Alarm-and-Safety-Systems
Fire detection and alarm components
Integration with electrical systems
BOQ items and quantity take-off practices
Module 9: Vertical Transportation Services (Electrical)
9-Vertical-Transportation-Services-Electrical
Power supply and control for lifts/escalators
Emergency power and backup provisions
BOQ for lift electrical works
Module 10: Testing, Commissioning, and Handover
10-Testing-Commissioning-and-Handover
Inspection and testing items to include
Commissioning documentation requirements
Final adjusting items and provisional sums
Preview - Electrical BOQ Preparation Guide for MEP and Civil Engineers for a G+45 High Rise Building
Discuss (
0
)
navigate_before
Previous
Next
navigate_next