arrow_back
Module 1: Introduction to UAE Construction Project Management Framework
1-Construction-Project-Management-as-per-UAE-Authority-Standards
Overview of UAE Construction Regulatory Environment
Roles of DM, RTA, DEWA & ADM in Construction Oversight
Project Lifecycle under UAE Authority Approvals
Module 2: Project Initiation & Feasibility Analysis
2-Project-Initiation-and-Feasibility-Analysis
Concept Design and Feasibility Report Preparation
Land Use Permissions and Plot Verification from DM & ADM
Preliminary Coordination with DEWA & RTA for Utility and Access
Module 3: Planning Approvals and Authority Interface
3-Planning-Approvals-and-Authority-Interface-in-UAE-Construction
Planning Permission Process under Dubai Municipality
Zoning, Building Height, FAR & Setback Regulations
Coordination between DM, RTA, DEWA & Civil Defense during Design Stage
Module 4: Design Development as per UAE Standards
4-Design-Development-as-per-UAE-Standards
Structural & Architectural Design Guidelines – DM & ADM Standards
Infrastructure Interface – RTA Road Design & Access Control Requirements
Utility Layouts and Service Corridor Planning (DEWA & Etisalat/NOC Coordination)
Module 5: Authority Drawings & NOC Management
5-Authority-Drawings-and-NOC-Management
NOC Requirements from DEWA, RTA, Etisalat, DU, and Civil Defense
Drawing Submission Process via Dubai Building Permit Portal & Abu Dhabi e-Permitting
NOC Coordination & Tracking – Common Delays and Resolutions
Module 6: Tendering and Procurement as per UAE Practices
6-Tendering-and-Procurement-as-per-UAE-Practices
Tender Documentation aligned with UAE Contracting Laws
Prequalification and Vendor Registration under DM, RTA, and DEWA
Bid Evaluation, Negotiation, and Award Procedures
Module 7: Project Scheduling and Progress Planning
7-Project-Scheduling-and-Progress-Planning
Preparation of Project Schedule as per DM/RTA Timeframes
Linking Authority Approvals to Milestone Activities
Reporting and Progress Updates for Authority Compliance
Module 8: Construction Permits and Site Mobilization
Construction Permit Requirements (DM, ADM)
Traffic Diversion & Site Access Approvals from RTA
DEWA Power & Water Temporary Connection Approvals
8-Construction-Permits-and-Site-Mobilisation_pdf
Module 9: Utility Coordination and Execution Standards
9-Utility-Coordination-and-Execution-Standards
DEWA Electricity & Water Network Connection Procedures
RTA Road & Infrastructure Coordination During Execution
Drainage, Sewerage, and Stormwater Systems – DM/ADM Guidelines
Module 10: Quality Control & Material Approvals
10-Quality-Control-and-Material-Approvals
Material Submittals and Authority Approval Formats
Quality Assurance Procedures per DM/ADM Requirements
Inspection and Material Testing Protocols for RTA/DEWA Projects
Module 11: Health, Safety & Environmental Management
11-Health-Safety-and-Environmental-Management-in-UAE-Construction
Construction HSE Regulations by DM, RTA, and DEWA
Environmental Impact and Waste Management Procedures
Safety Documentation, Site Audits, and Compliance Reporting
Module 12: Site Supervision and Inspection Procedures
12-Site-Supervision-and-Inspection-Procedures
DM and ADM Site Supervision Standards and Engineer Responsibilities
Inspection Requests (IR) and Work Clearance Procedures
Non-Conformance Reporting and Corrective Actions
Module 13: Contract Administration and Change Management
13-Contract-Administration-and-Change-Management
Contractual Clauses as per UAE Authority Templates
Managing Variations, Change Orders & Extension of Time
Dispute Resolution and Authority Arbitration Channels
Module 14: Interface Management among DM, RTA, DEWA & ADM
14-Interface-Management-among-DM-RTA-DEWA-and-ADM
Coordination Framework and Role Delineation between Authorities
Common Interdepartmental Approval Delays and Solutions
Integrated Project Delivery through Effective Communication
Module 15: Cost Management and Authority Fee Structures
15-Cost-Management-and-Authority-Fee-Structures
Cost Components and Authority Charges (DM, RTA, DEWA, ADM)
BOQ Preparation as per UAE SOR Guidelines
Budget Control and Cost Tracking for Authority-Linked Projects
Module 16: Documentation and Record-Keeping
16-Documentation-and-Record-Keeping-for-UAE-Construction-Projects
Document Control Systems Required by DM & ADM
As-Built Drawings and Completion Documentation Standards
Authority Submission Formats for Project Closure
Module 17: Testing, Commissioning & Authority Inspections
17-Construction-Project-Management-as-per-UAE-Authority-Standards
Final Inspection Requirements from DM, DEWA & RTA
Testing & Commissioning Procedures for Services and Utilities
Snagging, Rectification & Clearance Certificate Process
Module 18: Completion Certificate & Handover Procedures
18-Completion-Certificate-and-Handover-Procedures
Process for DM/ADM Completion Certificate (Building Completion)
RTA & DEWA Handover Procedures for Infrastructure and Utilities
Client Handover, DLP (Defect Liability Period) & Warranty Obligations
Module 19: Sustainability & Green Building Compliance
19-Sustainability-and-Green-Building-Compliance
Dubai Green Building Regulations and Estidama Pearl Rating (Abu Dhabi)
Authority-Approved Energy Efficiency Measures
Sustainable Construction Materials and Water Conservation Practices
Module 20: Case Studies & Best Practices
20-Case-Studies-and-Best-Practices
Successful Projects under DM, RTA, DEWA & ADM Standards
Common Non-Compliance Issues and Lessons Learned
Professional Ethics & Project Management Excellence in UAE
Preview - Construction Project Management as per UAE Authority Standards – DM, RTA, DEWA & ADM Professional Certification
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US
FEES OFFERS
Extra Discounts!!