arrow_back
Module 1: Introduction to CSI MasterFormat
1-Mastering-CSI-MasterFormat-for-Quantity-Surveyors-and-Cost-Engineers
1.1 History and Evolution of CSI MasterFormat in the USA
1.2 Importance for QS and Cost Engineers in Construction Projects
1.3 CSI MasterFormat vs. Other Classification Systems (e.g., UNIFORMAT, Omniclass)
1.4 Role in Cost Estimation, BOQ, and Project Documentation
Module 2: Structure of CSI MasterFormat
2-CSI-MasterFormat-Training-for-Quantity-Surveyors-and-Cost-Engineers-in-USA-Projects
2.1 Understanding Divisions, Sections, and Subsections
2.2 Standard 50-Division Format (Latest Version)
2.3 Relationship between Specifications, Drawings, and Estimates
2.4 Navigating CSI MasterFormat Index and Codes
Module 3: Divisions 00 & 01 – Procurement and Contracting Requirements
3-CSI-MasterFormat-Training-for-Quantity-Surveyors-and-Cost-Engineers-in-USA-Projects
3.1 Division 00: Procurement and Bidding Information
3.2 Division 01: General Requirements (Admin, QC, Submittals)
3.3 How QS Uses Div. 00 & 01 for BOQ and Tender Documents
3.4 Case Examples: Contractual Clauses Affecting Cost Estimation
Module 4: Divisions 02 to 05 – Site Works & Structural Works
4-CSI-MasterFormat-Training-for-Quantity-Surveyors-and-Cost-Engineers-in-USA-Projects
4.1 Division 02 – Existing Conditions & Site Preparation
4.2 Division 03 – Concrete Works: BOQ & Costing Methods
4.3 Division 04 – Masonry Works: Material Specifications & Rates
4.4 Division 05 – Metals & Structural Steel Estimation
Module 5: Divisions 06 to 09 – Architectural Finishes
5-CSI-MasterFormat-Architectural-Finishes-Divisions-06-09
5.1 Division 06 – Wood, Plastics & Composites
5.2 Division 07 – Thermal & Moisture Protection (Waterproofing, Insulation, Roofing)
5.3 Division 08 – Openings (Doors, Windows, Curtain Walls, Glazing)
5.4 Division 09 – Finishes (Plaster, Drywall, Paint, Flooring, Ceilings)
Module 6: Divisions 10 to 14 – Specialties, Equipment, Conveying Systems
6.1 Division 10 – Specialties (Signage, Toilet Partitions, Lockers)
6.2 Division 11 – Equipment (Institutional & Commercial Equipment)
6.3 Division 12 – Furnishings (Casework, Furniture, Window Treatments)
6.4 Division 14 – Conveying Systems (Elevators, Escalators, Lifts)
Module 7: Divisions 21 to 23 – Fire Protection & Mechanical Systems
7.1 Division 21 – Fire Suppression Systems
7.2 Division 22 – Plumbing Systems
7.3 Division 23 – HVAC Systems (Heating, Ventilation, Air Conditioning)
7.4 Cost Breakdown Structures for MEP Estimation
Module 8: Divisions 25 to 28 – Integrated Automation, Electrical & Safety
8.1 Division 25 – Integrated Automation & Smart Systems
8.2 Division 26 – Electrical Systems (Wiring, Panels, Power Distribution)
8.3 Division 27 – Communications Systems (Data, Voice, Security)
8.4 Division 28 – Electronic Safety & Security Systems
Module 9: Divisions 31 to 35 – Site & Infrastructure Works
9.1 Division 31 – Earthwork & Excavation
9.2 Division 32 – Exterior Improvements (Paving, Landscaping, Fencing)
9.3 Division 33 – Utilities (Water Supply, Sewerage, Drainage, Gas)
9.4 Division 34 & 35 – Transportation & Waterway/Marine Works
Module 10: Specialty Divisions 40 to 48 – Industrial & Process Works
10.1 Division 40 – Process Integration
10.2 Division 41 – Material Processing & Handling Equipment
10.3 Division 43 – Process Gas & Liquid Handling
10.4 Division 48 – Electrical Power Generation
Module 11: CSI MasterFormat in BOQ Preparation
11.1 Linking CSI Divisions to Quantity Take-Offs
11.2 Preparing BOQ using CSI Codes
11.3 Grouping and Packaging Works for Estimation & Tendering
11.4 Practical Templates for BOQ in US Projects
Module 12: CSI MasterFormat in Cost Estimation & Budgeting
12.1 Unit Rate Analysis Based on CSI Sections
12.2 Mapping Material & Labor Costs to CSI Codes
12.3 Cost Loading & Forecasting Using CSI MasterFormat
12.4 Example: Estimation for a Mid-Rise Commercial Project
Module 13: CSI MasterFormat in Specifications & Contracts
13.1 Writing Technical Specifications Linked to CSI Codes
13.2 Contract Clauses Based on CSI Divisions
13.3 Coordination Between QS, Engineers, and Architects
13.4 Common Errors in Specification Writing and Cost Impact
Module 14: CSI MasterFormat in Project Management & Scheduling
14.1 Integration with WBS & Scheduling
14.2 Linking CSI Divisions with Primavera/MSP Activities
14.3 Cost & Time Control through CSI Structure
14.4 Case Study: High-Rise Project Scheduling with CSI
Module 15: Advanced Applications & Case Studies
15.1 CSI MasterFormat in Green Building & Sustainability Projects
15.2 Case Study: Hospital Project Estimation Using CSI
15.3 Case Study: Industrial Facility Estimation Using CSI
Preview - CSI MasterFormat Training for Quantity Surveyors & Cost Engineers in USA Projects
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
CALL US !