arrow_back
1. Introduction to Substation Projects
o Overview of substation projects, their importance in power distribution and transmission.
o Key components of a 765 KVA substation (transformers, switchgear, circuit breakers, etc.).
o Understanding the role of the Power Grid Corporation of India Limited in substation projects.
2. Project Planning and Design
o Steps in substation design and planning, including feasibility studies.
Sample Report of Feasibility Study for Substation Project
o Understanding electrical single-line diagrams, layout designs, and equipment specifications.
o Regulatory requirements and standards for substation design in India.
o Timeline and resource allocation for project execution.
3. Site Preparation and Mobilization
o Site selection criteria and geotechnical surveys for a substation.
o Land clearance, leveling, and excavation requirements for a 765 KVA substation.
o Mobilizing construction equipment, materials, and labor for the project site.
4. Procurement and Logistics Management
o Process of procurement of major substation equipment (transformers, switchgear, etc.).
o Vendor selection, contracts, and delivery schedules.
o Managing logistics for transportation and storage of equipment and materials.
5. Civil Work Management
o Foundation work for equipment like transformers and switchgear.
o Concrete works, structural steel fabrication, and installation.
o Drainage, fencing, and security measures around the substation site.
o Health and safety measures during civil work execution.
6. Electrical Installation and Commissioning
o Installation of transformers, switchgear, protection and control panels.
o Cabling, grounding, and earthing of substation equipment.
o Testing and commissioning of electrical systems.
o Safety checks and standards during electrical installation.
7. Quality Control and Assurance
o Developing a quality management plan for the substation project.
o Procedures for monitoring and ensuring quality during civil and electrical work.
o Testing methods and inspections for substation equipment.
o Handling deviations and ensuring compliance with project specifications.
8. Health, Safety, and Environmental Management
o Implementing safety standards and protocols specific to high-voltage electrical works.
o Personal protective equipment (PPE) requirements for workers.
o Managing environmental impact, including noise, air pollution, and waste disposal.
o Emergency response plans and hazard identification.
9. Project Scheduling and Cost Management
o Creating a detailed project schedule using tools like Gantt charts.
Gantt_Chart_Project_Schedule
o Budgeting for labor, materials, and overhead costs.
o Tracking progress, managing delays, and ensuring timely completion.
o Risk management techniques to handle cost overruns and delays.
10. Project Handover and Documentation
o Final inspections and testing before handover to Power Grid Corporation of India Limited.
o Compiling as-built documentation and operation manuals.
o Ensuring regulatory compliance for commissioning and grid connectivity.
o Post-project support and maintenance guidelines.
EXCEL FORMATS TO USE IN SUBSTATION CONSTRUCTION SITE MANAGEMENT
project_timeline
resource_allocation
budget_tracking
procurement_plan
equipment_inventory
work_breakdown_structure
risk_management_log
daily_progress_report
construction_schedule_tracker
labor_cost_tracker
change_order_log (1)
material_consumption_tracker
testing_commissioning_schedule
vendor_performance_evaluation
maintenance_log
commissioning_checklist
handover_checklist
Preview - 765 KVa SUBSTATION CONSTRUCTION PROJECTS SITE MANAGEMENT ONLINE TRAINING FOR ELECTRICAL ENGINEERS
Discuss (
0
)
navigate_before
Previous
Next
navigate_next
Pop-Up Message
Call Us Guidance